Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

689 unique locations (1847 components) - Page 22 of 28

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
P & C Attfield Lodge Farm Countesthorpe Road Whetstone, Leicestershire LE8 6LD (2 components)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU Conditional LE8
Inactive • 2019-20 (T-1)
P & C Attfield, Lodge Farm, Countesthorpe Road, Whetstone, Leicestershire LE8 6LD (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
45.67 MW
Peel Industrial Estate, Chamberhall Street, Bury, Lancashire, BL9 0LU (2 components)

20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network. (2)

Reciprocating engines BURY POWER LIMITED Existing Generating CMU Bury Power Bury Power BL9
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Peel Industrial Estate, Chamberhall Street, Bury, Lancashire, BL9 0LU (5 components)

20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
37.55 MW
Philip Steet, Bristol, BS2 0TA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
6.66 MW
Picow Farm Rd, Runcorn WA7 1DA (1 component)

Gas peaking reciprocating engines

Reciprocating engines CHICKERELL STORAGE LIMITED New Build Generating CMU Weston Point Power Limited 036 Conditional WA7
Inactive • 2022-23 (T-4)
38.06 MW
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (2 components)

The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been …

Reciprocating engines Valencia Waste Management Limited Refurbishing Generating CMU Pilsworth Gas Peaking BL9
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Pilsworth Rd, Heywood OL10, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected
Inactive • 2022-23 (T-4)
3.81 MW
Pioneer Mill, Milltown St, Radcliffe, Manchester, M26 1WN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional M26
Inactive • 2022-23 (T-4)
19.03 MW
Pioneer Rd, Andover SP11 8HJ, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected SP11
Inactive • 2022-23 (T-4)
3.81 MW
Plot 11,Scarborough Road, Fairfield Industrial Estate, Louth, Lincolnshire, LN11 0WP. (2 components)

A 8MW New Build gas fuelled generating station. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Plot 3a Dukes Drive Kingmoor Park CA6 4SL (3 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Existing power station comprised of multiple reciprocating engines
Reciprocating engines KINGSMOOR POWER LIMITED New Build Generating CMU KINGSMOOR CA6
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Plot 3a, Dukes Drive, Kingmoor Park, CA6 4SL (6 components)
• Existing power station comprised of multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
35.69 MW
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (4 components)
• A 20MW New Build gas fuelled generating station.
• A 8MW New Build gas fuelled generating station.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) A.E. MORRIS LIMITED New Build Generating CMU SKIRBY SKIRBY +1 more Conditional WF9
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
34.17 MW
Plot A3, Watervole Way, Doncaster, DN4 5JP (2 components)
• A 20MW new build gas generating station..
• A new build gas generating station.
Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU PENRITH2 DN4
Inactive • 2020-21 (T-4), 2019-20 (T-1)
37.86 MW
Plot B Land at Severn Road Avonmouth BS10 7SE (1 component)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Reciprocating engines FPC INDUSTRY & ENTERPRISE 2 LIMITED New Build Generating CMU Severn Road 7 Not Prequalified BS10
Inactive • 2023-24 (T-4)
14.25 MW
Plot D, Faraday Business Park, Solent Airport, Daedalus, Lee-on-the-Solent, Hampshire, PO13 9FW (2 components)

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Vulcan Power Limited New Build Generating CMU Vulcan Power Not Prequalified PO13
Inactive • 2023-24 (T-4), 2022-23 (T-3)
18.81 MW
Plot G11, Bennett St, Bridgend Industrial Estate, Bridgend, CF31 3RS (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional CF31
Inactive • 2022-23 (T-4)
19.03 MW
Plot N2C, Castle Road, Sittingbourne, ME10 3SQ (3 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export. (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (SITTINGBOURNE) LIMITED New Build Generating CMU SITTINGBOURNE POWER SITTINGBOURNE POWER +1 more ME10
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Plot N2C, Castle Road, Sittingbourne, ME10 3SQ (5 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2022-23 (T-1) ...
34.27 MW
Plymouth Energy Park (Former Toshiba Site), Ernsettle Lane, Plymouth. PL5 2EY Note: OS ref SX446601, postcode PL5 2EY, and postcode PL5 2TT and PL5 2TS all relate to the same site. Postcode is ambiguous as site has not been allocated a postcode by the (4 components)
• The site consists of 48 diesel generators. (2)
• This is an additional CMU component in addition to the existing 20MW diesel plant on the site. This CMU has been created on the basis of a recent bid to convert part of this plant to provide EFR. If that bid is successful then this CMU will be used to apply to provide CM services from the upgraded site. If the EFR bid is unsuccessful this CMU application may be withdrawn and the existing CMU used. The CMU will be based in a diesel/battery hybrid configuration providing 10MW of generation. The plant will be produced through an upgrade of the existing diesel site.
Reciprocating engines Keystone Power Limited Existing Generating CMU Keystone EFR Plymouth +1 more PL5
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Plymouth Energy Park (Former Toshiba Site), Ernsettle Lane, Plymouth. PL5 2EY, Note: OS ref SX446601, postcode PL5 2EY, and postcode PL5 2TT and PL5 2TS all relate to the same site. Postcode is ambiguous as site has not been allocated a postcode by the post office at the current time). (5 components)
• The site consists of 48 diesel generators.
• This is an additional CMU component in addition to the existing 20MW diesel plant on the site. This CMU has been created on the basis of a recent bid to convert part of this plant to provide EFR. If that bid is successful then this CMU will be used to apply to provide CM services from the upgraded site. If the EFR bid is unsuccessful this CMU application may be withdrawn and the existing CMU used. The CMU will be based in a diesel/battery hybrid configuration providing 10MW of generation. The plant will be produced through an upgrade of the existing diesel site.
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
67.79 MW
Pontefract Road, Stourton, Leeds, LS10 1AZ (2 components)

New reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Pontefract Rd Pontefract Rd LS10
Inactive • 2020-21 (T-4), 2019-20 (T-1)
12.94 MW
Loading map...
Showing 25 locations