Reciprocating engines

577 unique locations (2052 components) - Page 23 of 24

Asher Lane, Ripley, Derbyshire, DE5 3RE (4 components)
• New reciprocating genset in acoustic enclosure
• New reciprocating engine in acoustic enclosure. *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code.
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6ZA (5 components)

The system comprises of two gas reciprocating engines provided an exported output of around 2MW. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
8.65 MW
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
40.44 MW
Appley Bridge Landfill Appley Lane N Appley Bridge Wigan WN6 9AD (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
4.76 MW
Anchor Lane Abbess Roding Ongar CM5 0JR (12 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
62.76 MW
Albion Close, Worksop, Nottinghamshire, S80 1RA (3 components)

New reciprocating genset in acoustic enclosure (2)

Inactive • 2020-21 (T-4), 2019-20 (T-1)
11.22 MW
Accrington Road, Burnley, Lancashire, BB11 5DP (1 component)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Inactive • 2022-23 (T-4)
19.03 MW
Aaron Road Industrial Estate Peterborough Cambridgeshire PE7 2EX (9 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
64.19 MW
A66 and Tees Dock Road, Grangetown TS6 7HJ (2 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2019-20 (T-1)
22.83 MW
A65, Kirby Lonsdale, Carnforth, LA6 2HH (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
14.36 MW
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components)

Gas generation peaking plant comprising of 9 x 2MW engines (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
33.24 MW
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (8 components)

A new build gas fuelled generating station. (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
151.12 MW
9A Parker Avenue Felixstowe IP11 4AD (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
11.87 MW
9A Parker Ave Felixstowe IP11 4AD (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
4.76 MW
7 Tartraven Place, Broxburn, West Lothian EH52 5LT (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
14.36 MW
53 Valley Road Plymouth PL7 1RF (9 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
42.82 MW
525 Brenda Rd, Hartlepool TS25 1HT (4 components)

Gas fired reciprocating engines. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
77.05 MW
4 Guildford Road Cranleigh GU6 8PE (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (14 components)

Peak power plant (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
143.17 MW
4 Chemistry Lane, Pentre, Deeside, CH5 2DW (3 components)

14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
39.39 MW
2 Anchor lane, Bilston, WV14 9NA (1 component)

Energy Centre comprising of lean burn acoustically treated natural gas reciprocating engines

Inactive • 2022-23 (T-4)
22.83 MW
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
303.94 MW
20 Wallace Way Hitchin SG4 0SE (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
3.81 MW
160 Ipswich Road, Stoke Holy Cross, Norwich NR14 8PQ, UK (3 components)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology. (2)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
140.17 MW
125 Cheston Road Birmingham B7 5EA (1 component)

Energy centre comprising of lean burn, acoustically treated natural gas reciprocating engines.

Inactive • 2022-23 (T-4)
5.71 MW
Loading map...
Showing 25 locations