Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 26 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Land off Askews Farm Lane, Cliffside Industrial Estate, Greys, RM17 5XR (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU CLIFFSIDE INDUSTRIAL Not Prequalified RM17
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
Land off Axe Road, Colley Lane Industrial Estate, Bridgewater, TA6 5LP (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4)
6.86 MW
Land off Axe Road, Colley Lane Industrial Estate, Bridgwater, TA6 5LP (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating Engines Reciprocating engines CONRAD (BRIDGWATER) LIMITED New Build Generating CMU Bridgwater Bridgwater +1 more TA6
Active • 2024-25 (T-4), 2024-25 (T-1) ...
20.52 MW
Land off Baker Street, Greenock, PA15 4TP (1 component)

A new build, gas fuelled generation station.

Reciprocating engines BAKER STREET GENERATION LIMITED New Build Generating CMU Baker Street Generation Limited Conditional PA15
Inactive • 2022-23 (T-4)
9.51 MW
Land off Bowbridge Lane, Balderton, Newark NG24 3BY (5 components)
• 4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Bowbridge Lane
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear located at Bowbridge Lane
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (NEWARK) LIMITED EL (Newark) Limited New Build Generating CMU Bowbridge Bowbridge 1 +3 more NG24
Active • 2025-26 (T-4), 2024-25 (T-4) ...
33.27 MW
Land off Carseview Road, Forfar, DD8 3BS (7 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
20.96 MW
Land off Fulwood Road North, Sutton in Asfield, Nottinghamshire, NG17 2NB (1 component)

New reciprocating genset in acoustic enclosure

Inactive • 2022-23 (T-4)
5.59 MW
Land Off Gelderd Road, Beeston, Leeds. LS12 6DX. (3 components)

A 20MW New Build gas fuelled generating station.

Reciprocating engines A.E. MORRIS LIMITED New Build Generating CMU GELDER GELDER Conditional LS12
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Land off George Smith Way, Lufton, Yeovil, Somerset. BA22 8QR (1 component)

New build gas reciprocating multi-engine generating plant

Reciprocating engines SITE STOR LUFTON LTD New Build Generating CMU Site STOR Lufton Ltd Conditional BA22
Inactive • 2022-23 (T-4)
14.27 MW
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH. This site PQ'd last year as CCBS15 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN's network at 33kV.

Reciprocating engines FLEXIBLEGRIDPOWER3 LTD New Build Generating CMU Carbrain Gas Conditional G67
Inactive • 2022-23 (T-3), 2022-23 (T-4)
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH. This site PQ'd last year as CCBS15 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN's network at 33kV.

Inactive • 2022-23 (T-4), 2022-23 (T-3)
18.92 MW
Land off Green Street, Wigan, WN3 4HN (1 component)

A gas fuelled electricity generating station.

Reciprocating engines Aberla Energy Trading Limited New Build Generating CMU Green Street Not Prequalified WN3
Active • 2024-25 (T-4)
19.04 MW
LAND OFF HELEN STREET, GLASGOW, G51 3AR (1 component)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Reciprocating engines Gas Generation Helen Street Limited New Build Generating CMU Gas Generation Helen Street Conditional G51
Inactive • 2022-23 (T-4)
18.93 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (9 components)

Reciprocating genset

Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU High View Road High View Road +1 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.31 MW
Land off Kibworth Road, Moss Farm, Kibworth Beauchamp, Leicester, LE8 0HJ (6 components)
• 2.5MW gas fired peaking power plant
• 5MW gas fired peaking power plant
• Containerised Reciprocating Gas Engines
Reciprocating engines MWAT LIMITED MWKB21 LIMITED New Build Generating CMU MWKB11 MWKB12 LE8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.63 MW
Land off Linketty Lane, Marshall Road, Plymouth PL7 4NR (2 components)

Gas fuelled Generating Sets

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU WG20 PL7
Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
Land off Linketty Lane, Marshall Road, Plymouth PL7 4NW (1 component)

Gas fuelled Generating Sets

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU WG20 PL7
Inactive • 2022-23 (T-1)
6.59 MW
Land off Liverpool Street, Digbeth, Birmingham, B9 4DS (3 components)

A new build power plant 5 MW of Reciprocating Gas Engines and associated plant on land off Liverpool Street, Digbeth, Birmingham. B9 4DS

Active • 2025-26 (T-4), 2023-24 (T-4) ...
9.52 MW
Land off Main Road, Weston, CW2 5LD (3 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
56.82 MW
Land off Merseyton Road, Ellesmere Port, Cheshire West and Chester, CH65 2JE (2 components)

A new build, gas fueled generation station

Reciprocating engines BAKER STREET GENERATION LIMITED New Build Generating CMU Ellesmere Port Docks Ellesmere Port Docks Not Prequalified CH65
Active • 2026-27 (T-4), 2025-26 (T-4)
38.13 MW
Land off Mount Road, Castle Gresley, Swadlincote, DE11 9ES (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines SWB Power Ltd New Build Generating CMU BURTON ROAD GRESLEY Conditional DE11
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
14.35 MW
Loading map...
Showing 25 locations