ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (1 component)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Reciprocating engines FLEXITRICITY LIMITED Existing Generating CMU FLEX163 FK2
Active • 2025-26 (T-4)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Aberdare Power Station Aberdare Power Station +9 more Rejected CF44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Abercorn Street, Paisley, PA3 4DF (5 components)

A new build, gas fuelled generation station. (3)

Reciprocating engines ABERCORN GENERATION LIMITED New Build Generating CMU Abercorn Road Abercorn Road +2 more PA3
Active • 2024-25 (T-4), 2023-24 (T-1) ...
19.04 MW
Accrington Road, Burnley, Lancashire, BB11 5DP (1 component)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Reciprocating engines Edge Power (Decoy) Limited New Build Generating CMU 2018 20MW ONE Rejected BB11
Inactive • 2022-23 (T-4)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)

Existing OCGT (3)

Reciprocating engines Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Viking Power Viking Power +5 more TS2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
127.07 MW
Adsworth Road, Stockport, SK3 8LF (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Stockport Not Prequalified SK3
Active • 2024-25 (T-4), 2021-22 (T-1)
Albion Close, Worksop, Nottinghamshire, S80 1RA (2 components)

New reciprocating genset in acoustic enclosure (2)

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Albion Close Albion Close S80
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Reciprocating engines ALDON POWER LIMITED New Build Generating CMU Aldon Aldon +2 more FY6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.28 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (7 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Energy from Waste Reciprocating engines ALLIUM HELMSLEY LTD New Build Generating CMU Alne Alne +4 more YO61
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.05 MW
Anchor Lane Abbess Roding Ongar CM5 0JR (3 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (MATCHING) LIMITED New Build Generating CMU Conrad (Matching) Limited Conrad (Matching) Limited +1 more CM5
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Anchor Lane Abbess Roding Ongar CM5 0JR (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) CONRAD (MATCHING) LIMITED New Build Generating CMU Conrad (Matching) Limited Conrad (Matching) Limited +1 more CM5
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Appley Bridge Landfill Appley Lane N Appley Bridge Wigan WN6 9AD (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Appley Bridge Conditional WN6
Inactive • 2022-23 (T-4)
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (3 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (LANGAGE) LIMITED New Build Generating CMU Langage Langage +1 more PL7
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Reciprocating engines CONRAD (LANGAGE) LIMITED New Build Generating CMU Langage Langage PL7
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (10 components)

One Jenbacher CHP engine with a generation capacity of 3.36 MW (3)

Reciprocating Engines Reciprocating engines Combined Heat and Power (CHP) GLASS LEAF POWER LIMITED Existing Generating CMU Branfield Energy Centre Glassleaf Power +2 more HU15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.31 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (4 components)

Gas reciprocating engines (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.13 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (8 components)

Gas reciprocating engines (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.97 MW
Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF (2 components)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Arlesey 4,5,6 SG15
Active • 2028-29 (T-4)
3.07 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6ZA (2 components)

The system comprises of two gas reciprocating engines provided an exported output of around 2MW. (2)

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Asher Lane, Ripley, Derbyshire, DE5 3RE (3 components)
• New reciprocating genset in acoustic enclosure (2)
• New reciprocating engine in acoustic enclosure. *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code.
Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Asher Lane 2 Asher Lane 2 +1 more Conditional DE5
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Ashland Cottage Farm, Beck Lane, Sutton in Ashfield, NG17 3AH (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines FISHPOND ENERGY LIMITED New Build Generating CMU Ashlands Ashlands +1 more NG17
Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.61 MW
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

Reciprocating engines MERSEY GENERATION LIMITED New Build Generating CMU Protos Generation - 1 Protos Generation - 2 +1 more CH2
Active • 2028-29 (T-4)
46.28 MW
Ash Road, Protos, CH2 4LB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional CH2
Inactive • 2022-23 (T-4)
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Reciprocating engines Peel L&P Energy Limited New Build Generating CMU Protos Balancing Services Plant Not Prequalified CH2
Active • 2024-25 (T-4)
Ashton Old Road, Openshaw, Manchester M11 1AA (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Reciprocating engines ASHTON POWER LIMITED New Build Generating CMU Ashton Ashton +2 more M11
Active • 2024-25 (T-4), 2023-24 (T-1) ...