Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

489 unique locations (2092 components) - Page 3 of 20

Active MW: 14652.51 MW
Inactive MW: 930.44 MW
Titanium Road, Cocket, Swansea, SA5 4NH (6 components)
• STOR diesel engines that will operate environmentally with mixed fuel (2)
• New build site with gas reciprocating engines to replace diesel plant
Reciprocating engines GFI73 LTD Refurbishing Generating CMU Swansea Swansea SA5
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.96 MW
Tir John North Road, St Thomas, SA1 8NS (1 component)

Gas fired reciprocating engines.

Reciprocating engines PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU DG004 Not Prequalified SA1
Active • 2024-25 (T-4)
Tickhill Road Rotherham South Yorkshire S66 7QW (1 component)

Gas reciprocating engines

Reciprocating engines REGENT PARK ENERGY LIMITED Existing Generating CMU Maltby S66
Active • 2025-26 (T-4)
Tickhill Road Rotherham South Yorkshire S66 7QW (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Maltby S66
Active • 2024-25 (T-1)
1.98 MW
Thurscoe Business Park Barrowfield Rd Thurscoe Rotherham S63 0DB (4 components)

Gas reciprocating engines (3)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Hickleton Hickleton +1 more S63
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.28 MW
Thistlebrook Farm, Tring Road, Wingrave, HP22 4LN (1 component)

A New Build Distributed Connected Gas Fueled Generating Station.

Reciprocating engines ARL 021 LIMITED New Build Generating CMU Wingrave HP22
Active • 2027-28 (T-4)
47.08 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) CORPOWER LIMITED New Build Generating CMU Corpower Corpower +3 more Not Prequalified SS17
Active • 2025-26 (T-4), 2024-25 (T-1)
8.21 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (14 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Long Barrow Power Station Sevington Power Station +7 more TN24
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (15 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Bridgwater Power Station Bridgwater Power Station +8 more Rejected TA6
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (5 components)

A new build, gas fuelled generation station. (3)

Reciprocating engines BELLEKNOWES GENERATION LIMITED New Build Generating CMU Belleknowes Generation Limited Belleknowes Generation Limited +2 more KY11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (10 components)

6 x reciprocating engines (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Tewin Road, Welwyn Garden City, AL7 1BD (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines WGC ENERGY CENTRE LIMITED New Build Generating CMU WGC ENERGY CENTRE LIMITED Not Prequalified AL7
Active • 2026-27 (T-4)
17.13 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (15 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (3)

Reciprocating Engines Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) SPARK STEAM LIMITED Existing Generating CMU Spark Steam Energy Centre Spark Steam Energy Centre +3 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (5 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound. (3)

Reciprocating engines SUTTON POWER LIMITED Existing Generating CMU Sutton Manor Sutton Manor +1 more WA8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.64 MW
Sutton Landfill Site Huthwaite Road Sutton-In-Ashfield Mansfield, NG17 2HB (3 components)

Gas fired reciprocating engine(s) (3)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU SUTTON SUTTON Not Prequalified NG17
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Sutton Farm Sutton Lane Broughton Astley Leicester, LE9 6QF (10 components)

New build power station comprised of multiple reciprocating engines. (3)

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU SUTTON SUTTON +4 more LE9
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s) (2)
• Solar PV generation site
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU SUTTONCOURTENAY Sutton Courtenay Solar Not Prequalified OX14
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Styal Road, Wythenshawe, Manchester, M22 5WB (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Moss Nook Not Prequalified M22
Active • 2025-26 (T-4)
STONE CROSS LANE GOLBORNE WA3 2SF (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Nook Power Not Prequalified WA3
Active • 2024-25 (T-4)
Stone Circle, Shap, Cumbria, CA10 3PZ (2 components)
• A new build gas fuelled generation station
• A new build, gas fuelled generation station
Reciprocating engines AVONMOUTH GENERATION LIMITED New Build Generating CMU Fell Energy Shap Energy CA10
Active • 2027-28 (T-4)
42.46 MW
Stone Circle, A6, Shap, Cumbria, CA10 3PZ (2 components)

A new build, gas fuelled generation station.

Reciprocating engines FORSA ENERGY (BERYL STREET) HOLDINGS LIMITED New Build Generating CMU Shapell2 Shapfell1 Not Prequalified CA10
Active • 2024-25 (T-4)
Steventon Road, Abingdon,OX13 6RW (1 component)

A new build 6MW gas fuelled generating station.

Reciprocating engines ARL 028 Limited New Build Generating CMU Steventon Not Prequalified OX13
Active • 2024-25 (T-4)
Station Road, Cuffley, EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Cuffley Not Prequalified EN7
Active • 2024-25 (T-4)
Stather Road, Flixborough, DN15 8RR (5 components)
• 2 x 1.2mw gas generator units to be installed on designated land at Stather Raod
• 2.4MW gas fired peaking power plant
• A gas fuelled generating station comprised of multiple reciprocating engines
Reciprocating engines ARL 018 LIMITED ARL 018 LIMITED New Build Generating CMU Stather Road Stather Road +1 more Not Prequalified DN15
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.24 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (11 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
Reciprocating engines ST ASAPH POWER LIMITED Existing Generating CMU St Asaph Power St Asaph Power +5 more LL17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
Loading map...
Showing 25 locations