Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 33 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Manvers, Callflex Business Park, South of Doncaster Road, Rotherham, S63 7EF (7 components)
• Gas generating unit(s)
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Manvers S63
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.40 MW
Markham Lane Duckmanton Chesterfield S44 5HS (2 components)

Gas reciprocating engines. (2)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Markham Markham S44
Active • 2025-26 (T-4), 2024-25 (T-4)
Markham Lane Duckmanton Chesterfield S44 5HS (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Markham S44
Inactive • 2023-24 (T-1)
1.91 MW
Markham Lane, Duckmanton, Chesterfield S44 5HS (4 components)

Gas reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.42 MW
Markham Lane, Duckmanton, Chesterfield, S44 5HS (8 components)
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
• Gas reciprocating engines.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Markham S44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.72 MW
Markinch Power Station, Glenrothes, KY7 6GU (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Inactive • 2022-23 (T-4)
18.93 MW
Marlborough Road, Royal Wootton Basset, SN4 7SR (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Wootton Basset Not Prequalified SN4
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
Marlborough Road, Royal Wootton Bassett, SN4 7SR (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines WOOTTON POWER LTD New Build Generating CMU Wootton Bassett Not Prequalified SN4
Active • 2024-25 (T-4)
6.78 MW
Marl Road, Knowsley Industrial Park, Kirkby, Knowsley, L33 7UH (1 component)

A new build, gas fueled generation station

Reciprocating engines BAKER STREET GENERATION LIMITED New Build Generating CMU Knowsley Not Prequalified L33
Active • 2025-26 (T-4)
19.09 MW
Marshall Road, Plympton, Plymouth, PL7 4NW (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Linketty Lane Linketty Lane Not Prequalified PL7
Active • 2024-25 (T-4)
11.33 MW
Marsh Green Industrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (8 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
305.00 MW
Marsh Lane, Boston PE21 7SJ (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional PE21
Inactive • 2022-23 (T-4)
19.03 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (7 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Castle Bromwich Castle Bromwich +2 more B76
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.31 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, West Midlands, B76 1AL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (CASTLE BROMWICH) LIMITED New Build Generating CMU Castle Bromwich B76
Active • 2025-26 (T-1)
11.87 MW
M & D Business Park, Burtonhead Road, St. Helens, WA9 5EA (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU M&D Business park Conditional WA9
Inactive • 2022-23 (T-4)
19.03 MW
M&D Business Park, St Helens, WA9 5EA (1 component)

10 x 2MW gas generator units to be installed on designated land within a compound at M & D business Park, St Helens, WA9 5EA

Reciprocating engines BURTONHEAD ROAD POWER LIMITED New Build Generating CMU M & D BUSINESS PARK Rejected WA9
Inactive • 2023-24 (T-4)
19.00 MW
Meadow Lane, Long Eaton, Nottingham, NG10 2GD (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU MEADOW LANE Conditional NG10
Inactive • 2022-23 (T-4)
7.14 MW
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets.
Storage Reciprocating engines OCGT and Reciprocating Engines STOR 126 LTD New Build Generating CMU Birshaw Birshaw +3 more OL2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
81.80 MW
Meek St, Royton, Oldham OL2 6HL (2 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 132 Ltd New Build Generating CMU OL2
Active • 2028-29 (T-4)
14.96 MW
Merlin Park Burscough L40 8JY (4 components)

Works required to complete the site will include:- 1 Construction of a Grid Connection between the site and the Distribution Network 2 Construction of gas connection between the site and … (3)

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU MERLIN MERLIN PARK L40
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Merlin Park, Burscough, L40 8JY (10 components)
• Works required to complete the site will include:- 1 Construction of a Grid Connection between the site and the Distribution Network 2 Construction of gas connection between the site and the Gas Network 3 Construction of site compound including surfacing of compound, drainage and erection of fencing 4 Construction of multiple engine and infrastructure bases 5 Installation of multiple new containerised reciprocating gas engines 6 Electrical work to connect generating sets to grid connection including supply of transformers and switchgear as necessary 7 Gas work to connect the generating sets to the gas supply 8 Commissioning
• Works required to complete the site will include:- 1 Construction of a Grid Connection between the site and the Distribution Network 2 Construction of gas connection between the site and the Gas Network 3 Construction of site compound including surfacing of compound, drainage and erection of fencing 4 Construction of multiple engine and infrastructure bases 5 Installation of multiple new containerised reciprocating gas engines 6 Electrical work to connect generating sets to grid connection including supply of transformers and switchgear as necessary 7 Gas work to connect the generating sets to the gas supply 8 Commissioning
Active • 2025-26 (T-4), 2024-25 (T-4) ...
76.11 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SF (6 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating Engines Reciprocating engines WHARF POWER LIMITED Existing Generating CMU Wharf Power Wharf Power CH62
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
30.04 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (10 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
120.38 MW
Middlefield Farm, Durham Road, Thorpe Thewles, TS21 3LF (1 component)

Gas peaking reciprocating engines

Reciprocating engines Norton East Power Limited New Build Generating CMU Norton East Power Limited 035 Conditional TS21
Inactive • 2022-23 (T-4)
47.56 MW
Loading map...
Showing 25 locations