Reciprocating engines

1206 unique locations (4419 components) - Page 36 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Old Church Lane Mountnessing Brentwood CM13 1UP (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Billericay Conditional CM13
Inactive • 2019-20 (T-1)
Old Church Lane, Mountnessing, Brentwood, CM13 1UP (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4), 2019-20 (T-1)
9.51 MW
Old Coal Pit, A876, Kennet, Clackmannanshire, Scotland, FK10 4DY (2 components)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
9.50 MW
Old Hall Street Properties, Fallows Way, Whiston, Prescot, L35 1RZ (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Fallows Way Conditional L35
Inactive • 2022-23 (T-4)
19.03 MW
Old Ively Road, Farnborough, Hampshire, GU14 0LX (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Active • 2027-28 (T-4)
14.91 MW
Old Ively Road, Farnborough, Hampshire,GU14 0LX (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines WP GRID STORAGE 6 LIMITED New Build Generating CMU Farnborough Power Station Not Prequalified GU14
Active • 2027-28 (T-4)
14.91 MW
Old Littleton Road, Chertsey, Surrey, TW17 9NU (5 components)
• A New Build gas generating station..
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Castle Bromwich Chertsey +2 more TW17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
62.02 MW
Old Littleton Road, Chertsey, TW17 9NU (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chertsey Not Prequalified TW17
Active • 2026-27 (T-4), 2023-24 (T-1)
34.26 MW
Old Mill Industrial Estate, Mansfield, NG18 2AT (6 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Port CMM Port +1 more NG18
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
13.89 MW
Old Mill Industrial Estate, Mansfield, NG19 9BG (3 components)
• 1 x MWM TCG 2016V
• Gas fired generating unit
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.97 MW
Old Parkbury Lane, Frogmore, AL2 2DZ (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
3.81 MW
Ongar Landfill Site Mill Lane High Ongar Essex CM5 9RG (3 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engine(s)
Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED Existing Generating CMU OTGS17 OTGS17 CM5
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Ongar Landfill Site, Mill Lane, High Ongar, Essex, CM5 9RG (6 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engine(s)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
10.46 MW
On land adjacent to Old Greenock Road and M8 Junction 30, Renfrewshire, PA7 5NP. (3 components)

A new build, gas fuelled generation station.

Reciprocating engines ERSKINE GENERATION LIMITED New Build Generating CMU Erskine Generation Limited Erskine Generation Limited PA7
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
37.93 MW
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (6 components)

A new build, gas fuelled generation station.

Reciprocating engines DRUMCROSS GENERATION LIMITED New Build Generating CMU Drumcross Generation Limited Drumcross Generation Limited +3 more EH54
Active • 2025-26 (T-4), 2024-25 (T-4) ...
94.65 MW
Outclough Farm, Biddulph Road, Stoke-on-Trent ST6 8UW (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines SWB Power Ltd New Build Generating CMU WHITFIELD WHITFIELD Conditional ST6
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
11.41 MW
Outclough Farm Whitfield Lane Chatterly Whitfield Stoke on Trent, ST6 8UW (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU Conditional ST6
Inactive • 2019-20 (T-1)
Outclough Farm, Whitfield Lane, Chatterly Whitfield, Stoke on Trent, ST6 8UW (2 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
11.42 MW
Over Lane, Almondsbury, BS32 4RX (4 components)

A gas fuelled generating station.

Reciprocating engines ARL 029 Limited New Build Generating CMU Over Lane A Over Lane B Not Prequalified BS32
Inactive • 2023-24 (T-4), 2022-23 (T-3)
8.55 MW
Oxford Road Yeovil BA21 5HR (3 components)

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant (3)

Reciprocating engines CONRAD (YEOVIL) LIMITED New Build Generating CMU Yeovil Yeovil +1 more BA21
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Oxford Road, Yeovil, BA21 5HR (6 components)
• Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
52.37 MW
Pandora Business Park Greengate Middleton Manchester M24 1RU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD (MIDDLETON JUNCTION) LIMITED New Build Generating CMU Middleton Junction Middleton Junction +2 more M24
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
8.19 MW
Pandora Business Park Greengate, Middleton, Manchester, M24 1RU (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
31.71 MW
Paradise Lane, Bishop's Waltham SO32 2TH (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU BISHOPS Conditional SO32
Inactive • 2022-23 (T-4)
4.76 MW
Park Farm, Hook Street, Lydiard Tregoze, Wiltshire, SN5 3NY (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW