Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

565 unique locations (3571 components) - Page 4 of 23

Bridge Road North, Wrexham Industrial Estate, Wrexham, LL13 9QS (2 components)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Inactive • 2022-23 (T-4)
Bridge Road, Wrexham Industrial Estate, LL13 9PS (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Brimrod Mill Corporation Road Rochdale OL11 4HJ (1 component)

Energy centre comprising of lean burn, acoustically treated, national gas reciprocating engines.

Inactive • 2022-23 (T-4)
Briscoe Ln, Manchester, M40 2XP (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (15 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.19 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.22 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (15 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.19 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (14 components)

1 * 1.7MW diesel reciprocating engine

Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.19 MW
Brook Farm, Arncott, OX25 1NY (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Burghfield Road, Reading, RG30 3RA (3 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Inactive • 2022-23 (T-4)
Burnbank Power Plant, Site to south of Burnbank Street, Greenhill, Coatbridge, North Lanarkshire ML5 2AY (3 components)

10 Gas reciprocating engines use for power generation with associated infrastructure

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Burntstump Landfill Site, Ollerton Road, Arnold, Nottinghamshire, NG5 8PR (1 component)

The site comprises of gas reciprocating unit(s)

Inactive • 2022-23 (T-4)
Buttermilk Lane, Bolsover, S44 6AD (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
4.77 MW
By 7 Tartraven Place, Broxburn, West Lothian. EH52 5LT (2 components)

Reciprocating Gas Engines (5 x 2MW) to be installed on designated land in the East Mains industrial estate.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Caerwent Lane, Mathern, NP16 6UN (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Caker Lane, Alton, GU34 3BF (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Caledon Green, Earls Gate Park, Grangemouth, FK3 8TR (3 components)

A new build, gas fuelled generation station.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (10 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2022-23 (T-3) ...
9.15 MW
Cards Road, Sandon CM2 7AE (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4)
7.62 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (48 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3471.17 MW
Castle Hill Road, Bransholme, Sutton, Kingston Upon Hull, HU7 4TX (1 component)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4)
Cavendish Rd Stevenage SG1 2ET UK (27 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (22 components)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
51.60 MW
Centurion Way, Farington, Leyland, PR25 3UQ (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Challenge Way, Blackburn, Lancashire BB1 5QB (3 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations