Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

339 unique locations (2486 components) - Page 4 of 14

Prospect House Sandycroft Deeside CH5 2QJ (17 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Private Road No.5, Colwick, Nottingham, NG4 2JU (10 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Pringle Street, Blackburn, BB1 1SA (5 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1.90 MW
Port Talbot, Port Talbot Works, SA13 2NG (15 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
57.23 MW
Pontefract Road, Stourton, Leeds, LS10 1AZ (7 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Plot N2C, Castle Road, Sittingbourne, ME10 3SQ (16 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Plot B Land at Severn Road Avonmouth BS10 7SE (1 component)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2023-24 (T-4)
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (6 components)
• A 20MW New Build gas fuelled generating station.
• A 8MW New Build gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Plot 3a Dukes Drive Kingmoor Park CA6 4SL (13 components)
• Existing power station comprised of multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Pioneer Rd, Andover SP11 8HJ, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
Pioneer Mill, Milltown St, Radcliffe, Manchester, M26 1WN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Pilsworth Rd, Heywood OL10, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
Picow Farm Rd, Runcorn WA7 1DA (1 component)

Gas peaking reciprocating engines

Inactive • 2022-23 (T-4)
Phillips Lane, Colne, BB8 9PQ (6 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
Philip Steet Bristol BS2 0TA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Peel Industrial Estate, Chamberhall Street, Bury, Lancashire, BL9 0LU (9 components)

20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
P & C Attfield Lodge Farm Countesthorpe Road Whetstone, Leicestershire LE8 6LD (10 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Part Of Plots 15 And 16 Unit Rw 1 Bankwood Lane New Rossington Doncaster DN11 0PS (9 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Park Road, Bacup, OL13 0BW (6 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1.90 MW
Park Farm Hook Street Lydiard Tregoze Wiltshire SN5 3NY (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Paradise Lane, Bishop's Waltham SO32 2TH (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Oxford Road Yeovil BA21 5HR (15 components)

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
14.25 MW
Outclough Farm Whitfield Lane Chatterly Whitfield Stoke on Trent, ST6 8UW (5 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (5 components)

A new build, gas fuelled generation station.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations