Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1208 unique locations (4420 components) - Page 40 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
9.18 MW
Rhymney STOR Gen Room Unit 48 Portmanmoor Road Industrial Estate Rover Way Cardiff CF24 5HB (2 components)

Gas reciprocating engines (2)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Rhymney Rhymney CF24
Active • 2028-29 (T-4), 2024-25 (T-4)
6.78 MW
Rhymney, STOR Gen Room, Unit 48, Portmanmoor Road Industrial Estate, Rover Way, Cardiff, CF24 5HB (4 components) Geocoding Needed
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Rhymney CF24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.50 MW
Ribble Court, Red Scar Business Park, Preston, Lancashire, England, PR2 5LX (2 components) Geocoding Needed

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Longridge 1 Longridge 2 PR2
Active • 2028-29 (T-4)
14.96 MW
Rigby Landfill Site, Chorley Road, Standish, Wigan, WN1 2XL (1 component) Geocoding Needed

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional WN1
Inactive • 2022-23 (T-4)
2.71 MW
Road off Ffordd William Morgan, St Asaph, LL17 0JB (2 components) Geocoding Needed

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
Road off Ffordd William Morgan St Asaph LL17 0LF (1 component)

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU St. Asaph B Not Prequalified LL17
Active • 2024-25 (T-4)
Road off Ffordd William Morgan, St Asaph, LL17 0LF (1 component) Geocoding Needed

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Active • 2024-25 (T-4)
4.76 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (9 components) Geocoding Needed
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating Engines Reciprocating engines CONRAD (ROCHESTER) LIMITED New Build Generating CMU Rochester Rochester +1 more ME2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
25.02 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (1 component)

New build gas reciprocating multi-engine generating plant

Reciprocating engines VPI IMMINGHAM ENERGY PARK A LIMITED New Build Generating CMU VPI Energy Park A DN40
Active • 2024-25 (T-1)
47.08 MW
Rosper Road, Immingham, North Lincolnshire, DN40 3DZ (18 components) Geocoding Needed
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11434.68 MW
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (2 components)
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Rounponds Energy Limited, Roundponds Farm, Melksham, Wiltshire SN12 8DF (4 components) Geocoding Needed
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
37.83 MW
Royal Mail, Dunsby Road, Milton Keynes MK6 4AD (3 components) Geocoding Needed

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 111 Ltd New Build Generating CMU Dunsby Dunsby Conditional MK6
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
41.83 MW
Royal Oak Way North, Daventry, NN11 8PQ (3 components) Geocoding Needed
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Reciprocating engines Balance Energy 4 Ltd New Build Generating CMU Braunston Braunston Not Prequalified NN11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.85 MW
RWE Generation UK plc, Hythe Power Station, Charleston Road Hardley Hythe Southampton SO45 3BP (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Reciprocating engines RWE GENERATION UK PLC New Build Generating CMU CMU_HYTB18 Conditional SO45
Inactive • 2022-23 (T-4)
RWE Generation UK plc, Hythe Power Station, Charleston Road, Hardley, Hythe, Southampton, SO45 3BP (1 component) Geocoding Needed

The CMU will be formed of multiple gas reciprocating engines.

Inactive • 2022-23 (T-4)
4.99 MW
Salford Road, Over Holton, Bolton, Lancashire BL5 1BW (5 components) Geocoding Needed

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines SALFORD POWER LIMITED New Build Generating CMU Salford Salford +2 more BL5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.10 MW
Sandfold Ln, Gorton, Manchester M18 7DT (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 133 Ltd New Build Generating CMU Alexandria Conditional M18
Inactive • 2022-23 (T-4)
20.93 MW
Sandy Lane, Worksop, Nottingham, S80 1TL (2 components) Geocoding Needed

New reciprocating genset in acoustic enclosure.

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Sandy Lane Sandy Lane S80
Inactive • 2020-21 (T-4), 2019-20 (T-1)
13.12 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components) Geocoding Needed
• A Prospective New Build Gas reciprocating energy reserve facility
• Gas reciprocating energy reserve facility
Active • 2024-25 (T-4), 2023-24 (T-4) ...
230.52 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (4 components) Geocoding Needed

Brigg Gas Peaker

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU 8RESAK 8RESAK DN20
Active • 2026-27 (T-4), 2025-26 (T-4) ...
158.29 MW
Sedburgh Road, Halifax, HX3 9HB (4 components) Geocoding Needed

A gas fuelled generating station.

Reciprocating engines AVE 012 Limited New Build Generating CMU Sedburgh Road A Sedburgh Road B Not Prequalified HX3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
3.80 MW
Severn Road, Almondsbury, Bristol, BS10 7GD (3 components) Geocoding Needed
• A new build, gas fuelled generation station
• A new build, gas fuelled generation station.
Reciprocating engines AVONMOUTH PROJECT CO LIMITED New Build Generating CMU Avonmouth Shapfell 1 +1 more BS10
Active • 2027-28 (T-4), 2026-27 (T-4)
47.08 MW
Loading map...
Showing 25 locations