Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1159 unique locations (5745 components) - Page 41 of 47

Budds Plantation Paices Hill Aldermaston RG7 4PJ (5 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Brunel Way, Briton Ferry, SA11 2GA (15 components)
• Gas fired reciprocating engines.
• Reciprocating engines
Active • 2024-25 (T-4), 2023-24 (T-4) ...
15.39 MW
Browney Lane, Meadowfield , DH7 8XR (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Brook Farm, Arncott, OX25 1NY (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (13 components)

1 * 1.7MW diesel reciprocating engine

Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.36 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (13 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.36 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.39 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (14 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.36 MW
Bristol Avenue Moor Park Blackpool FY2 0LZ (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Bristol Avenue Moor Park Blackpool FY2 0LZ (1 component)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4)
Briscoe Ln, Manchester, M40 2XP (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Brimrod Mill Corporation Road Rochdale OL11 4HJ (1 component)

Energy centre comprising of lean burn, acoustically treated, national gas reciprocating engines.

Inactive • 2022-23 (T-4)
Bridge Street, Stalybridge, SK15 1PH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4)
1.43 MW
Bridge Road, Wrexham Industrial Estate, LL13 9PS (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Bridge Road North, Wrexham Industrial Estate, Wrexham, LL13 9QS (1 component)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Inactive • 2022-23 (T-4)
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
30.39 MW
Bransdale Road, Kippax, Leeds, WF10 2AX (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Brampton Lane, Chapel Brampton, Northampton, NN6 8BA (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2024-25 (T-4)
Bradgate Landfill Site, Bradgate Hill, Markfield, Leicester, Leicestershire, LE6 0FA (1 component)

The site comprises of gas reciprocating unit(s)

Inactive • 2022-23 (T-4)
Bradford Road Batley Kirklees WF17 6JS (20 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bowlers Croft, Basildon, SS14 3HH (3 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2022-23 (T-1)
Bourton, Buckingham, MK18 7DU (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
Loading map...
Showing 25 locations