Booth Lane, Sandbach, Cheshire CW11 3PY (1 component)

A gas fueled distribution connected generating station

Active • 2028-29 (T-4)
23.37 MW
Booth Lane Sandbach Cheshire CW11 3PY (1 component)

A new build gas fuelled generating station.

Active • 2026-27 (T-4)
42.83 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.67 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.48 MW
Booker Cash and Carry Didcot OX11 7HJ (7 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.14 MW
Booker Cash and Carry Didcot OX11 7HJ (3 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.14 MW
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (8 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Bond Avenue Bletchley Milton Keynes MK1 1JJ (24 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.70 MW
Boarhunt Rd, Fareham, PO17 6AJ (4 components)

Gas fired reciprocating engines

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (9 components)
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
• Total installed capacity is 7,952kW OF gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Blankenham Nursery, Great Blankenham, Bramford, Ipswich, Suffolk, IP8 4JU (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2027-28 (T-4)
6.79 MW
Blacknell Lane Crewkerne TA18 7HE (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Bison Place, Leyland, PR26 7QR (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Bishops Waltham, Botley Road, Bishops Waltham, SO32 1DR (3 components)
• 10 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Inactive • 2022-23 (T-4)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (3 components)

Gas reciprocating engines

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (1 component)

Gas reciprocating engines

Inactive • 2019-20 (T-1)
Bidston Landfill Site, Bidston Industrial Estate, Wirral, Merseyside, CH44 2HE (3 components)
• Gas fired reciprocating engine(s)
• The site comprises of gas reciprocating unit(s)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bevercotes Energy Park West Drayton Avenue Bevercotes Nottinghamshire DN22 8DB (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (15 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1.07 MW
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (5 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Bentley Mill Way, Walsall, WS2 0BP (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (4 components)
• A 7.5MW new build gas generating station..
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.45 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (2 components)

A 7.5MW new build gas generating station..

Active • 2026-27 (T-4), 2025-26 (T-1)
14.15 MW
Bentinck Electricity Generating Plant Mill Lane Kirkby In Ashfield Nottinghamshire NG17 9LG (3 components)

Gas engine peaker plant providing capacity market, power trading and other balancing services.

Active • 2024-25 (T-4), 2021-22 (T-1)
Bentinck Electricity Generating Plant Mill Lane Kirkby In Ashfield Nottinghamshire NG17 9LG (1 component)

Gas engine peaker plant providing capacity market, power trading and other balancing services.

Inactive • 2021-22 (T-1)
Loading map...