Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1159 unique locations (5745 components) - Page 43 of 47

Belvoir Way, Fairfield Industrial Estate Louth LN11 0YZ (11 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Belvoir Way, Fairfield Industrial Estate Louth LN11 0YZ (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2019-20 (T-1)
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (5 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Active • 2025-26 (T-4)
Belvedere Lane, Bletchley, Milton Keynes, MK17 9JH (2 components)

3 x 2MW gas fuelled generators on a compound on land to west of A5.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Beale Valley Landfill Royton Rochdale OL1 4LT (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (4 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2023-24 (T-1) ...
33.68 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2023-24 (T-1) ...
11.32 MW
Bankside Industrial Estate, Middlefield, Glensburgh, Falkirk FK2 7XU (2 components)

The facility consists of a 19.9MW gas facility.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (3 components)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (1 component)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (1 component)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Ball's Hall, Montacute BA22 8SY (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Balle Street, Darwen, Blackburn BB3 2AZ (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (9 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (3 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.68 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (17 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.78 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (5 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Automated Processing Centre, Middle Bank, Doncaster DN4 5NE (3 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Attwood Road, Burntwood, WS7 3GF (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Active • 2024-25 (T-4), 2021-22 (T-4)
Aspatria Business Park, Park Road, Aspatria, CA7 3DP (6 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations