Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 48 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (10 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
60.09 MW
Weighbridge Rd, Deeside CH5 2LL, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected CH5
Inactive • 2022-23 (T-4)
1.90 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.07 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-4) ...
82.06 MW
Westerham Road, Sundridge, Kent, TN14 6ED (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX52 FLEX52 Conditional LS10
Inactive • 2022-23 (T-4), 2021-22 (T-4)
94.03 MW
Westwood Way, Wigan, WN3 4HH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Wigan A Not Prequalified WN3
Active • 2025-26 (T-4)
9.71 MW
Whaley Road, Barnsley, S75 1HT (1 component)

The CMU Component will be made up of gas fired engines.

Reciprocating engines EC PROJECT 2 LIMITED New Build Generating CMU Barugh2 Conditional S75
Inactive • 2022-23 (T-4)
14.27 MW
Whaley Road, Whaley Rd, Barnsley S75 1HQ (6 components)

Generating unit

Reciprocating engines ENEL X UK LIMITED Existing Generating CMU S75
Active • 2025-26 (T-4)
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RT (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Port Rejected WF10
Inactive • 2019-20 (T-1)
11.87 MW
4.05 MW
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (1 component)

Gas reciprocating engines.

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio WF10
Active • 2024-25 (T-1)
1.22 MW
Whessoe Road, Whessoe, Harrowgate Village, Darlington, DL3 0XD (1 component)

A new build, gas fuelled generation station.

Reciprocating engines BERYL STREET GENERATION LIMITED New Build Generating CMU Darlington Not Prequalified DL3
Active • 2024-25 (T-4)
19.71 MW
Whittington Rd, Barrow Hill, Chesterfield S43 2PW (2 components)

New reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Whittington Road Whittington Road S43
Inactive • 2020-21 (T-4), 2019-20 (T-1)
12.94 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbyshire, S80 3LH (7 components)
• 1 x 2MW gas gen sets at Whitwell Energy Park.
• Gas reciprocating engines as the generating unit.
• Gas reciprocating engines.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Whitwell S80
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.14 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (7 components)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
12.27 MW
Willand reserve Power EX15 2PJ (1 component)

16MW gas fired engines provide back up power to the local grid

Reciprocating engines AMZCO POWER LIMITED New Build Generating CMU WILLAND RESERVE Rejected EX15
Inactive • 2019-20 (T-1)
14.27 MW
Willow Farm Doncaster Road Tadcaster LS24 9PA (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU Conditional LS24
Inactive • 2019-20 (T-1)
Willow Farm, Doncaster Road, Tadcaster, LS24 9PA (2 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
12.37 MW
Willow Holme Road, Carlisle, CA3 9PF (1 component)

Gas fired reciprocating engines.

Reciprocating engines Dockside Power Limited New Build Generating CMU Conditional CA3
Inactive • 2022-23 (T-4)
19.03 MW
Wincham Lane, Wincham, Northwich, CW9 6DE (9 components)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines Wincham Lane Power Limited New Build Generating CMU WINCHAM WINCHAM +3 more CW9
Active • 2024-25 (T-4), 2023-24 (T-4) ...
138.07 MW
Loading map...
Showing 25 locations