Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

565 unique locations (3571 components) - Page 5 of 23

Chamberhall Street, Bury, Lancashire, BL9 0LU (5 components)

20MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
73.64 MW
Cheshire Power Station, North Road, Ellesmere Port, Cheshire, CH65 1AF (1 component)

CMU formed of multiple individual Reciprocating Engines

Active • 2024-25 (T-1)
18.85 MW
42.07 MW
Chickenhall Lane, Eastleigh, SO50 6RQ (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-1), 2023-24 (T-1)
20.50 MW
Church Field Road, Sudbury, CO10 2YA (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2024-25 (T-4)
7.14 MW
Church Fields Road, Sudbury, CO10 2YA (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
CLAYDON BUSINESS PARK GIPPING ROAD GREAT BLAKENHAM IPSWICH IP6 0NL (1 component)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
2.41 MW
Clay Pit Hill Peak Lopping Gas Station Dormington HR1 4EE (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Clay Tye Road, Upminster, RM14 3PL (2 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Clay Tye Road, Upminster, RM14 3PL, UK (2 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Inactive • 2022-23 (T-4)
Clay Wheels Lane, Sheffield, S6 1LZ (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.22 MW
Cliftonhall Road Newbridge Edinburgh EH28 8PW (1 component)

Multiple gas engine generators with an output to the distribution network of 10.5MW. To be installed on land at Newbridge in Edinburgh.

Inactive • 2022-23 (T-4)
Clifton Street, Miles Platting, M40 8HF (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.60 MW
Club Farm, Pimlico Link Road, Clitheroe BB7 1QW (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Inactive • 2022-23 (T-4)
Cody Technology Park, Old Ively Road, Farnborough, Hampshire, GU14 0LX (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
Coldhurst Street, Oldham, OL1 2BQ (2 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (10 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.69 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, CM9 5FA (1 component)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2022-23 (T-3) ...
9.16 MW
CPG Power Manchester Rd, Carrington, Manchester M31 4AY, UK (3 components)
• This CMU [CGTN_4] will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
• This CMU will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (3 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2026-27 (T-4), 2023-24 (T-1)
17.36 MW
Crookham Common Road, Thatcham, RG19 8BR (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Crosby Power, Church Street, Bootle, L20 1AF (6 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.20 MW
Cuffley Hill Cuffley Potters Bar Hertfordshire EN7 5HA (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.12 MW
Cunliff Road, Blackburn, BB1 5SX (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
4.76 MW
Loading map...
Showing 25 locations