Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1359 unique locations (6164 components) - Page 55 of 55

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Wincham Lane, Wincham, Northwich CW9 6DE (13 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wincham Lane, Wincham, Northwich, CW9 6DE (9 components)

New build power station comprised of multiple reciprocating engines. (3)

Reciprocating engines Wincham Lane Power Limited New Build Generating CMU WINCHAM WINCHAM +3 more CW9
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9UP (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional DN15
Inactive • 2022-23 (T-4)
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (13 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) WOLVERHAMPTON POWER LTD Existing Generating CMU Wolverhampton Power Wolverhampton Power +6 more WV1
Active • 2029-30 (T-4), 2028-29 (T-4) ...
59.03 MW
Woodhouse Energy Centre, A. Pearson and Sons? Nursery, Alderley Edge, SK9 7UW (9 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used. (2)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Worset Lane, Hartlepool, TS27 3BQ (9 components)

A new build, gas fuelled generation station (2)

Reciprocating engines FORSA ENERGY (SPANGO) HOLDINGS LIMITED New Build Generating CMU Hartmoor 2 Hartmoor 2 +4 more TS27
Active • 2029-30 (T-4), 2028-29 (T-4) ...
139.00 MW
Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Cranleigh Cranleigh Not Prequalified GU6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.42 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (29 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel) UK POWER RESERVE LIMITED Existing Generating CMU Asfordby 1 Power Station Asfordby 1 Power Station +12 more LE14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 9 locations