Reciprocating engines

991 unique locations (4569 components) - Page 40 of 40

Whessoe Road, Whessoe, Harrowgate Village, Darlington, DL3 0XD (1 component)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4)
Whittington Rd, Barrow Hill, Chesterfield S43 2PW (3 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
8.14 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbyshire, S80 3LH (6 components)
• 1 x 2MW gas gen sets at Whitwell Energy Park.
• Gas reciprocating engines as the generating unit.
Active • 2027-28 (T-4), 2020-21 (T-4) ...
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (5 components)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Willand reserve Power EX15 2PJ (2 components)

16MW gas fired engines provide back up power to the local grid

Inactive • 2019-20 (T-1)
Willow Farm Doncaster Road Tadcaster LS24 9PA (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Willow Holme Road, Carlisle, CA3 9PF (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Wincham Lane, Wincham, Northwich, CW9 6DE (12 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.58 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.08 MW
Worset Lane, Hartlepool, TS27 3BQ (6 components)

A new build, gas fuelled generation station (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
92.98 MW
Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (39 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 16 locations