Reciprocating engines

517 unique locations (2569 components) - Page 8 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Hound Road, Netley, Southampton, SO31 5FS (1 component) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Hamble Not Prequalified SO31
Active • 2024-25 (T-4)
5.71 MW
Howard Road, Park Farm Industrial Estate, Redditch B98 7SE (2 components) Geocoding Needed

Redditch 20MW Gas Peaker

Reciprocating engines CENTRICA BARRY LIMITED Existing Generating CMU 8RESAI B98
Active • 2025-26 (T-4), 2025-26 (T-1)
27.77 MW
Howard Road, Park Farm Industrial Estate, Redditch, B98 7SE (4 components) Geocoding Needed

Redditch 20MW Gas Peaker Project

Reciprocating engines CENTRICA BARRY LIMITED New Build Generating CMU 8RESAI B98
Active • 2026-27 (T-4), 2024-25 (T-1) ...
62.66 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (12 components) Geocoding Needed
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
168.56 MW
Jack Martin Way, Fintry, Dundee, DD4 9FF (2 components) Geocoding Needed

A new build, gas fuelled generation station.

Reciprocating engines FISHCROSS GENERATION LIMITED New Build Generating CMU Fintry Generation Fintry Generation DD4
Active • 2028-29 (T-4), 2027-28 (T-4)
37.38 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (22 components) Geocoding Needed
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. connections and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
Reciprocating engines KILN POWER LIMITED Existing Generating CMU Kiln Power Kiln Power +5 more LE10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.88 MW
Kingdom Avenue, Westbury, Wiltshire, BA13 4FG (2 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines HEYWOOD POWER LIMITED New Build Generating CMU Hawkeridge Sudbury BA13
Active • 2026-27 (T-4), 2025-26 (T-1)
13.67 MW
Kings Mill Hospital Mansfield Road Sutton in Ashfield NG17 4JL (1 component)

Gas reciprocating engines.

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio NG17
Active • 2025-26 (T-4)
Kings Mill Hospital, Mansfield Road, Sutton in Ashfield, NG17 4JL (5 components) Geocoding Needed
• 2 x 1.55 MW Contianerised Generating Sets.
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2025-26 (T-4), 2021-22 (T-4) ...
13.39 MW
Kirkgate, Inverkeithing, Fife, Scotland, KY11 1HY (1 component) Geocoding Needed

A new build, gas fueled generation station

Active • 2026-27 (T-4)
19.04 MW
Kirkgate, Inverkeithing, Fife, Scotland, KY11 1HY, (1 component)

A new build, gas fueled generation station

Reciprocating engines BLACK SHED GENERATION LIMITED New Build Generating CMU Knowsley KY11
Active • 2026-27 (T-4)
19.04 MW
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (3 components) Geocoding Needed

Gas fired reciprocating engine(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU KIRKLESS KIRKLESS Not Prequalified WN2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.71 MW
Kitching Road, Peterlee, SR8 2HP (7 components) Geocoding Needed
• A gas fuelled generating station.
• A new build 40MW gas fuelled generating station.
Reciprocating engines ARL 012 Limited New Build Generating CMU Kitching Road Kitching Road A +2 more Rejected SR8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
77.03 MW
Knapton Generating Station, East Knapton, Malton, YO17 8JF (2 components) Geocoding Needed
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will have a combined total output of 40.9 MWe.
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will have a combined total output of 9 MWe.
Reciprocating engines Knapton Energy One Limited New Build Generating CMU Knapton Peaking Plant Knapton Peaking Plant Not Prequalified YO17
Active • 2024-25 (T-4)
47.52 MW
Land Adjacent To Electricity Sub-Station, Agecroft Road, Pendlebury (1 component) Geocoding Needed

Small scale gas-fuelled electricity generation facility (14MW) with associated infrastructure.

Reciprocating engines HM AGECROFT LTD New Build Generating CMU
Active • 2024-25 (T-4)
13.33 MW
Land Adjacent to Stobarts Logistics, Off Branthwaite Road, Lillyhall, Workington, Cumbria, CA14 4ED (5 components) Geocoding Needed

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.86 MW
Land adjacent to the M4, Howe Lane, Maidenhead, SL6 3JL (8 components) Geocoding Needed

Gas reciprocating engines

Reciprocating engines MAIDENHEAD EAST POWER LIMITED MAIDENHEAD WEST POWER LIMITED New Build Generating CMU Maidenhead East Power Limited Maidenhead East Power Limited +6 more SL6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
380.77 MW
Land And Buildings On The North East Side Of Tame Street, Stalybridge, SK15 1QF (3 components) Geocoding Needed

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Tame Power Tame Power SK15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.20 MW
Land At Blacknell Lane, Crewkerne, Somerset, TA18 8LL (4 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
20.58 MW
Land at Bristol Avenue, Moor Park, Blackpool, FY2 0JF (2 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines Blackpool Power Limited New Build Generating CMU Blackpool Not Prequalified FY2
Active • 2024-25 (T-4), 2021-22 (T-1)
4.76 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components) Geocoding Needed
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Reciprocating engines Storage (Duration 2h) HD888CAP LIMITED New Build Generating CMU CAPENHURST CAPENHURST +2 more CH66
Active • 2025-26 (T-4), 2024-25 (T-4) ...
129.72 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (3 components) Geocoding Needed
• A New Build Gas fuelled power plant at Kirkby substation.
• A New Build Transmission Connected Battery Energy Storage System.
Reciprocating engines Storage (Duration 2h) KIRKBY BATTERY STORAGE LTD New Build Generating CMU KIRKBY Kirkby BESS L33
Active • 2027-28 (T-4), 2023-24 (T-4) ...
54.63 MW
Land at Dig Gate Lane, Kingsway Business Park, Rochdale, OL16 4NR (2 components) Geocoding Needed
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines ROCHDALE POWER LTD New Build Generating CMU DIG GATE LANE Rochdale Dig Gate Conditional OL16
Active • 2024-25 (T-4), 2022-23 (T-4)
11.33 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components) Geocoding Needed
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines Dollymans Power Limited New Build Generating CMU Dollymans Power 016 Dollymans Power 039 +3 more SS11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
191.99 MW
Land at Eagle Trading Estate, Willow Lane, Mitcham, CR4 4HR (1 component) Geocoding Needed

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Willow Power Not Prequalified CR4
Active • 2025-26 (T-4)
4.84 MW
Loading map...
Showing 25 locations