Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1208 unique locations (4420 components) - Page 8 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Southmoor Lane, Havant, PO9 1JW (2 components) Geocoding Needed
• A new power plant, with associated civil works, switchgear and electrical connection.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Langstone Not Prequalified PO9
Active • 2024-25 (T-4), 2020-21 (T-4)
23.60 MW
Southmoor Lane, Havant, Hampshire, PO9 1JW (3 components) Geocoding Needed
• New Build Generating CMU comprising of battery storage and associated plant.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2023-24 (T-4) ...
11.84 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (15 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU South Cornelly Power Station South Cornelly Power Station +8 more CF33
Active • 2028-29 (T-4), 2027-28 (T-4) ...
73.28 MW
SOUTH CLOSE, ROSYTON, SG8 5UH (7 components) Geocoding Needed

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.23 MW
SOUTH CLOSE ROSYTON SG8 5UH (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Orchard Power Orchard Power +1 more SG8
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.74 MW
Southbrook Farm, Sudbrook, Caldicot, NP26 5SR (3 components) Geocoding Needed

10 x 2MW gas generator units to be installed on designated land within Southbrook Farm

Reciprocating engines Energion Ltd. New Build Generating CMU Southbrook Farm Southbrook Farm Not Prequalified NP26
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Solway Trading Estate, Maryport, Cumbria, CA15 8NF (6 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
43.73 MW
Solway Trading Estate Maryport Cumbria CA15 8NF (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU MARYPORT CA15
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Snape Lane, Doncaster, DN11 8RU (2 components) Geocoding Needed
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
13.30 MW
Site To South Of, Burnbank Street, Greenhill, Coatbridge, North Lanarkshire, ML5 2AY (1 component) Geocoding Needed

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2022-23 (T-4)
18.84 MW
Site To South Of, Burnbank Street, Greenhill, Coatbridge, North Lanarkshire, ML52AY (1 component)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Reciprocating engines Gas Generation Coatbridge Limited New Build Generating CMU Gas Generation Coatbridge Conditional ML5
Inactive • 2022-23 (T-4)
SITE TO REAR OF CAVALIER ROAD, HEATHFIELD INDUSTRIAL, ESTATE NEWTON ABBOT DEVON, TQ12 6TQ (1 component) Geocoding Needed

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
1.90 MW
SITE TO REAR OF CAVALIER ROAD HEATHFIELD INDUSTRIAL ESTATE NEWTON ABBOT DEVON TQ12 6TQ (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected TQ12
Inactive • 2022-23 (T-4)
Shripney Trade Park, Shripney Road, Bognor Regis, PO22 9GH (2 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Bognor Not Prequalified PO22
Active • 2025-26 (T-4), 2022-23 (T-1)
9.55 MW
Shripney Road, Bognor Regis, PO22 9GH (2 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Bognor Bognor Not Prequalified PO22
Active • 2024-25 (T-4)
9.52 MW
Shotton Steelworks, Deeside, Flintshire, CH5 2LF (2 components) Geocoding Needed

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Dee Power Limited New Build Generating CMU Flint Power Conditional CH5
Inactive • 2022-23 (T-4)
30.06 MW
Shotton Steelworks, Deeside, Flintshire, CH5 2LF (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Dee Power Limited New Build Generating CMU Dee Power Limited Conditional CH5
Inactive • 2022-23 (T-4)
Shirland Lane, Greenland, Sheffield, S9 3FF (1 component) Geocoding Needed

A new build, gas fuelled generation station.

Reciprocating engines BAKER STREET GENERATION LIMITED New Build Generating CMU Attercliffe Not Prequalified S9
Active • 2024-25 (T-4)
17.52 MW
Shireoaks Road, Worksop S80 3HA (1 component) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Reciprocating engines Suncredit Solutions Limited New Build Generating CMU Conditional S80
Inactive • 2022-23 (T-4)
5.71 MW
Shirebrook 2, Acreage Lane, Shirebrook, Nottinghamshire, NG20 8RN (12 components) Geocoding Needed
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
62.47 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (4 components)

Gas reciprocating engines. (3)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Shirebrook Shirebrook +2 more NG20
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.36 MW
Shirebrook 1, Acreage Lane, Shirebrook, Nottinghamshire, NG20 8RN (13 components) Geocoding Needed
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
72.89 MW
Shingle Hall Farm, Sawbridgeworth, CM21 0LX (1 component) Geocoding Needed

A new build gas fuelled generating station. This represents 3MW of an overall 23MW capacity gas fuelled generating station. As indicated this CMU is linked to EDP114. EDP114 gained a …

Reciprocating engines Edge Power (Avro Business Park) Limited New Build Generating CMU Avro Business Park Rejected CM21
Inactive • 2022-23 (T-4)
2.85 MW
Sherburn in Elmet, Leeds, LS25 6JG (5 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
28.51 MW
Sherburn in Elmet Leeds LS25 6JG (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU GLENTROOL LS25
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Loading map...
Showing 25 locations