Reciprocating engines

1208 unique locations (4420 components) - Page 9 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF (10 components) Geocoding Needed
• Modular reciprocating engines
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
398.78 MW
Chesterfield Road, Swallownest, Sheffield, S26 4TL (2 components) Geocoding Needed

New reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Chesterfield Road Chesterfield Road S26
Inactive • 2020-21 (T-4), 2019-20 (T-1)
14.76 MW
Chesterfield Road, Swallownest, Sheffield. S26 4XA (3 components) Geocoding Needed
• 10 x 1mw gas generator units to be installed on designated Chesterfield Road- Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw gas generator units to be installed on designated Chesterfield Road- Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Reciprocating engines ARL 011 Limited New Build Generating CMU Conditional S26
Inactive • 2022-23 (T-4)
19.03 MW
Chickenhall Lane, Eastleigh, SO50 6RQ (3 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (BISHOPSTOKE) LIMITED New Build Generating CMU Bishopstoke Bishopstoke +1 more SO50
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.52 MW
Chicks Lane, Chewton Mendip, BA3 4BY (1 component) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Chewton Not Prequalified BA3
Active • 2024-25 (T-4)
4.38 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (8 components) Geocoding Needed

4 x reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.80 MW
Church Field Road, Sudbury, CO10 2YA (3 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED GREAT DUNMOW POWER LIMITED New Build Generating CMU Sudbury Sudbury A +1 more Not Prequalified CO10
Active • 2025-26 (T-4), 2024-25 (T-4)
20.30 MW
Church Fields Road, Sudbury, CO10 2YA (2 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU SUDBURY PRIMARY Not Prequalified CO10
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
Clarke Avenue Porte Marsh Industrial Estate Calne SN11 9BS (3 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (CALNE) LIMITED New Build Generating CMU Calne Calne +1 more SN11
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Clarke Avenue, Porte Marsh Industrial Estate, Calne, SN11 9BS (7 components) Geocoding Needed
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17.11 MW
Claverhouse Industrial Estate, Dundee, DD4 9QH (4 components) Geocoding Needed

A new build, gas fuelled generation station.

Reciprocating engines CLAVERHOUSE GENERATION LIMITED New Build Generating CMU Claverhouse Generation Limited Claverhouse Generation Limited +1 more DD4
Active • 2024-25 (T-4), 2023-24 (T-4) ...
56.88 MW
CLAYDON BUSINESS PARK, GIPPING ROAD, GREAT BLAKENHAM, IPSWICH, IP6 0NL (1 component) Geocoding Needed

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
2.41 MW
Clay Pit Hill Peak Lopping Gas Station, Dormington, HR1 4EE (2 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
23.79 MW
Clay Tye Rd, Cranham, London Borough of Havering, RM14 3PL, United Kingdom (1 component) Geocoding Needed

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Warley20 Not Prequalified RM14
Active • 2024-25 (T-4)
46.18 MW
Clay Tye Road, Upminster, RM14 3PL (2 components) Geocoding Needed

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Warley Not Prequalified RM14
Inactive • 2023-24 (T-4), 2022-23 (T-3)
47.02 MW
Clay Tye Road, Upminster, RM14 3PL, UK (1 component) Geocoding Needed

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Warley Conditional RM14
Inactive • 2022-23 (T-4)
46.14 MW
Clay Wheels Lane, Sheffield, S6 1LZ (2 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU CLAY WHEELS Not Prequalified S6
Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.22 MW
Cliftonhall Road, Newbridge, Edinburgh, EH28 8PW (1 component) Geocoding Needed

Multiple gas engine generators with an output to the distribution network of 10.5MW. To be installed on land at Newbridge in Edinburgh.

Inactive • 2022-23 (T-4)
9.99 MW
Clifton Street, Miles Platting, M40 8HF (2 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU STUART STREET Not Prequalified M40
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.60 MW
Club Farm, Pimlico Link Road, Clitheroe BB7 1QW (1 component) Geocoding Needed

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU CLUB FARM Conditional BB7
Inactive • 2022-23 (T-4)
19.03 MW
Cody Technology Park, Old Ively Road, Farnborough, Hampshire, GU14 0LX (1 component) Geocoding Needed

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Farnborough Power Limited New Build Generating CMU Farnborough Power Limited Conditional GU14
Inactive • 2022-23 (T-4)
15.03 MW
Coldhurst Street, Oldham, OL1 2BQ (2 components) Geocoding Needed

A gas fuelled generating station.

Reciprocating engines AVE 007 Limited New Build Generating CMU Coldhurst Street Not Prequalified OL1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
Collyland Road, Fishcross, FK10 3JN (2 components) Geocoding Needed

A new build, gas fuelled generation station.

Reciprocating engines FISHCROSS GENERATION LIMITED New Build Generating CMU Fishcross Fishcross Not Prequalified FK10
Active • 2025-26 (T-4), 2024-25 (T-4)
42.91 MW
Commerce Way Flitwick MK45 5BP (3 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (AMPTHILL) LIMITED New Build Generating CMU Ampthill Ampthill +1 more MK45
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Commerce Way, Flitwick, MK45 5BP (7 components) Geocoding Needed
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17.14 MW
Loading map...
Showing 25 locations