10 unique locations (161 components)

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (16 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
9.05 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2018-19 (T-1), 2020-21 (T-4) ...
44.21 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2018-19 (T-1), 2020-21 (T-4) ...
29.08 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
28.20 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
37.69 MW
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (9 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (3)

Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
37.99 MW
Land lying to the north west of Staithes Road, Hull, HU12 8DX (13 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2018-19 (T-1), 2021-22 (T-4) ...
38.89 MW
Land at Queens Road, Immingham, DN40 1QR (8 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2018-19 (T-1), 2021-22 (T-4) ...
29.54 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2020-21 (T-4), 2021-22 (T-4) ...
9.16 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
18.90 MW