Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

142 unique locations (1636 components) - Page 1 of 6

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (68 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
2.02 MW
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (2 components)

Gas reciprocating engines.

Active • 2024-25 (T-1), 2024-25 (T-4)
7.60 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2018-19 (T-1), 2020-21 (T-4) ...
44.21 MW
Waterswallows Lane, Buxton, SK17 7HP (2 components)

Energy facility comprising of reciprocating engine sets.

Active • 2024-25 (T-4)
16.00 MW
Waterswallows Lane, Buxton, Derbyshire SK17 7JD (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site

Active • 2023-24 (T-4), 2024-25 (T-4) ...
8.06 MW
UNITS A, B, C & D POSTLEY ROAD KEMPSTON BEDFORD MK42 7AG (2 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
25.50 MW
Unit D Kendale Road Scunthorpe DN16 1DT (19 components)

New build power station comprised of multiple reciprocating engines.

Active • 2020-21 (T-1), 2022-23 (T-3) ...
3.81 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (26 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2022-23 (T-3), 2022-23 (T-4) ...
24.75 MW
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (20 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2024-25 (T-1), 2024-25 (T-4)
2.09 MW
Thurscoe Business Park Barrowfield Rd Thurscoe Rotherham S63 0DB (3 components)

Gas reciprocating engines

Active • 2024-25 (T-4), 2026-27 (T-4) ...
10.35 MW
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (5 components)

A new build, gas fuelled generation station.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
37.95 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
24.33 MW
Sutton Farm Sutton Lane Broughton Astley Leicester, LE9 6QF (29 components)

New build power station comprised of multiple reciprocating engines.

Active • 2020-21 (T-1), 2022-23 (T-3) ...
5.71 MW
STONE CROSS LANE GOLBORNE WA3 2SF (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
4.82 MW
Stone Circle, A6, Shap, Cumbria, CA10 3PZ (1 component)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4)
21.43 MW
Steventon Road, Abingdon,OX13 6RW (1 component)

A new build 6MW gas fuelled generating station.

Active • 2024-25 (T-4)
5.71 MW
Sparrowhawk Road, Halesworth, East Suffolk, IP19 8QW (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2022-23 (T-1), 2023-24 (T-1) ...
20.56 MW
SOUTH CLOSE ROSYTON SG8 5UH (17 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2022-23 (T-1), 2022-23 (T-3) ...
18.90 MW
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (21 components)
• 4x Jenbacher JGS 616 GS
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
15.91 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (13 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2023-24 (T-4), 2024-25 (T-1) ...
52.07 MW
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (26 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines.The Power plant is connected to the WPD distribution network and WWU gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
74.45 MW
Loading map...
Showing 25 locations