Reciprocating engines

18 unique locations (334 components)

Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site

Active • 2023-24 (T-4), 2024-25 (T-4) ...
8.06 MW
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (5 components)

A new build, gas fuelled generation station. (3)

Active • 2022-23 (T-3), 2022-23 (T-4) ...
75.88 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (14 components)
• 16 MW power plant comprising of 8 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
44.63 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
18.70 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (2 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
Active • 2025-26 (T-4), 2028-29 (T-4)
26.22 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
27.91 MW
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (19 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2023-24 (T-1), 2024-25 (T-4) ...
46.53 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2023-24 (T-1), 2025-26 (T-4) ...
211.92 MW
Land lying to the north west of Staithes Road, Hull, HU12 8DX (13 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2018-19 (T-1), 2021-22 (T-4) ...
38.89 MW
Land at Kestral Road, Mansfield, NG18 5FU (11 components)

Reciprocating genset in acoustic enclosure

Active • 2022-23 (T-1), 2023-24 (T-1) ...
18.48 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (45 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. connections and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
119.74 MW
Griffiths Road, Lostock Gralam, Northwich, CW9 7XU (11 components)
• 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local gas network.
• 6MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local gas network.
Active • 2022-23 (T-3), 2023-24 (T-4) ...
74.78 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (22 components)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
51.60 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2023-24 (T-1), 2024-25 (T-4) ...
27.31 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2024-25 (T-4), 2025-26 (T-4) ...
28.70 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-1), 2024-25 (T-4) ...
39.67 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
18.47 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
18.90 MW