Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

72 unique locations (1032 components) - Page 1 of 3

Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (7 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2023-24 (T-1), 2025-26 (T-4) ...
34.28 MW
Wellington Street, Oldham, Lancashire OL4 1SA (6 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
29.30 MW
Welkin Road, Bredbury, SK6 2BH (4 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2022-23 (T-3), 2023-24 (T-4) ...
7.79 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (20 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2022-23 (T-4), 2023-24 (T-4) ...
15.06 MW
Thurscoe Business Park Barrowfield Rd Thurscoe Rotherham S63 0DB (3 components)

Gas reciprocating engines

Active • 2024-25 (T-4), 2026-27 (T-4) ...
10.35 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (22 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2020-21 (T-4), 2021-22 (T-4) ...
9.52 MW
Tewin Road, Welwyn Garden City, AL7 1BD (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2026-27 (T-4)
17.13 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
24.33 MW
Severn Road, Almondsbury, Bristol, BS10 7GD (2 components)

A new build, gas fuelled generation station

Active • 2026-27 (T-4), 2027-28 (T-4)
25.66 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (3 components)

Brigg Gas Peaker

Active • 2024-25 (T-1), 2025-26 (T-1) ...
135.85 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (13 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2023-24 (T-4), 2024-25 (T-1) ...
52.07 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (6 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2023-24 (T-1), 2024-25 (T-1) ...
56.69 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
53.54 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (15 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Active • 2020-21 (T-1), 2021-22 (T-4) ...
25.06 MW
Plot D2, Kingdom Avenue, Westbury, Wiltshire, South West England, England, BA13 4EW (10 components)

A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
26.18 MW
Plot 4 Hermitage Park, Harts Farm Way, Havant, PO91FA (1 component)

A new build, gas fuelled generation station

Active • 2026-27 (T-4)
19.04 MW
Old Littleton Road, Chertsey, TW17 9NU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2023-24 (T-1), 2026-27 (T-4)
68.53 MW
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (12 components)
• A power plant, with associated civil works, switchgear and electrical connection.
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2021-22 (T-4), 2022-23 (T-4) ...
Newton Aycliffe CO Durham DL5 6EA (30 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
27.91 MW
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (19 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2023-24 (T-1), 2024-25 (T-4) ...
46.53 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (17 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
59.49 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (18 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2021-22 (T-1), 2022-23 (T-1) ...
12.09 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2023-24 (T-1), 2025-26 (T-4) ...
211.92 MW
Loddon Power,Unit A, The Loddon Centre, Wade Road, Basingstoke, RG24 8QW (4 components)

16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network.

Active • 2026-27 (T-4), 2028-29 (T-4)
44.30 MW
llanddewi Brefi Road, Tregaron, SY25 6JP (5 components)

STOR diesel engines that will operate environmentally with mixed fuel

Active • 2023-24 (T-1), 2026-27 (T-4)
18.92 MW
Loading map...
Showing 25 locations