Reciprocating engines

11 unique locations (50 components)

Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (11 components)
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
• Total installed capacity is 7,952kW OF gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
6.27 MW
Church Field Road, Sudbury, CO10 2YA (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2024-25 (T-4)
7.14 MW
Elevator Road, Trafford Park M17 1BR (3 components)
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elavator Road
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elevator Road
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Langley's Lane, Old Mills, Radstock, BS39 7SS (8 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
5.70 MW
Land off A40 (London Road), Wheatley, OX33 1YL (8 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
13.58 MW
Land off Linketty Lane, Marshall Road, Plymouth PL7 4NR (2 components)

Gas fuelled Generating Sets

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Linketty Lane, Marshall Road, Plymouth PL7 4NW (4 components)

Gas fuelled Generating Sets

Inactive • 2022-23 (T-1)
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (4 components)
• 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
• 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
6.06 MW
Marshall Road, Plympton, Plymouth, PL7 4NW (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2024-25 (T-4)
11.33 MW
Prowse's Lane, Axbridge, BS26 2HP. (5 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2024-25 (T-1), 2023-24 (T-1)
26.15 MW
Tarmac, Whitefield Road, Bredbury, SK6 2QP (2 components)

7MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 11 locations