Reciprocating engines

517 unique locations (2569 components) - Page 12 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Land At Wolverhampton Powerhouse, Commercial Road, WV1 3QS. (2 components) Geocoding Needed

3 x 2.5 MW gas generator units to be installed at Land At Wolverhampton Powerhouse, Commercial Road, WV1 3QS.

Reciprocating engines HM PH (GP) LTD New Build Generating CMU Not Prequalified WV1
Active • 2026-27 (T-4), 2023-24 (T-1)
14.28 MW
Land at William Nadin Way, Tetron Point, Swadlincote, DE11 0WT (1 component) Geocoding Needed

2 x 2MW Gas fuelled generator units to be installed on designated land within a compound located at Tetron point

Reciprocating engines FPC ELECTRIC LAND LIMITED New Build Generating CMU Tetron Point Not Prequalified DE11
Active • 2024-25 (T-4)
3.81 MW
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components) Geocoding Needed
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD144WHI LTD New Build Generating CMU Whitegate Whitegate +1 more OL9
Active • 2025-26 (T-4), 2024-25 (T-4) ...
83.08 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components) Geocoding Needed
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Land at Unit 6, Caldershaw Centre, Ings Lane, OL12 7LQ (4 components) Geocoding Needed
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines INGS LANE POWER LTD New Build Generating CMU INGS LANE INGS LANE +1 more OL12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
18.07 MW
Land at Union Street, Masbrough, Rotherham, S61 1AA, Rotherham (8 components) Geocoding Needed

Reciprocating genset in acoustic enclosure

Active • 2024-25 (T-4), 2021-22 (T-1)
7.52 MW
Land at Union Street, Masbrough, Rotherham, S61 1AA (6 components) Geocoding Needed

Reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED Existing Generating CMU Union Street Union Street +2 more S61
Active • 2028-29 (T-4), 2027-28 (T-4) ...
36.69 MW
Land At Swanns Road, Cambridge, CB5 8HY (1 component) Geocoding Needed

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Swanns Power Not Prequalified CB5
Active • 2025-26 (T-4)
4.84 MW
Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH (16 components) Geocoding Needed
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
• A new build, gas fuelled generation plant with ancillary equipment.
• A new build, gas fuelled generation station
Reciprocating engines EL (SLH) LIMITED FLUXUM ENERGY LIMITED New Build Generating CMU SLH Ind Park0073 SLH Ind Park0074 +14 more SS17
Active • 2027-28 (T-4), 2026-27 (T-4) ...
240.60 MW
Land at Speke Hall Avenue, Liverpool L24 8DA (1 component) Geocoding Needed

20MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Reciprocating engines Peel L&P Energy Limited New Build Generating CMU Speke Balancing Services Plant L24
Active • 2024-25 (T-4)
19.04 MW
Land at Sough Road, Darwen, BB3 2TS (2 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines SOUGH POWER LTD New Build Generating CMU Sough Road Sough Road Not Prequalified BB3
Active • 2025-26 (T-4), 2024-25 (T-4)
13.35 MW
Land at Sookholme Road, Shirebrook, Mansfield, NG20 8SG, Shirebrook (6 components) Geocoding Needed

New reciprocating gensets in acoustic enclosure

Active • 2024-25 (T-4)
5.59 MW
Land at Sookholme Road, Shirebrook, Mansfield NG20 8SG Shirebrook (6 components)

New reciprocating gensets in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Sookholme Road NG20
Active • 2024-25 (T-4)
Land at Sharlands Road, Fareham, Hampshire, PO16 0QQ (1 component) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines FAREHAM POWER LIMITED New Build Generating CMU Fareham Not Prequalified PO16
Active • 2025-26 (T-4)
6.68 MW
Land at Queens Road, Immingham, DN40 1QR (7 components) Geocoding Needed
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) IMMINGHAM POWER LIMITED Existing Generating CMU Immingham Power Immingham Power +4 more DN40
Active • 2028-29 (T-4), 2027-28 (T-4) ...
89.83 MW
Land at Philips Lane Works, Philips Lane, Colne, Lancashire, BB8 9PQ (1 component) Geocoding Needed

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Reciprocating engines GREAT DUNMOW POWER LIMITED New Build Generating CMU Great Dunmow BB8
Active • 2026-27 (T-4)
6.57 MW
Land at Oswestry, Oswestry, SY11 4AA (5 components) Geocoding Needed
• A gas fuelled generating station.
• A new build 30MW gas fuelled generating station.
Reciprocating engines ARL 020 Limited New Build Generating CMU Oswestry Oswestry A +1 more Not Prequalified SY11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.06 MW
Land at Orwell Street, East Marsh, Grimsby, DN31 3HF, Grimsby (4 components) Geocoding Needed

New reciprocating gensets in acoustic enclosure

Active • 2024-25 (T-4)
3.73 MW
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components) Geocoding Needed
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD143OCK LTD New Build Generating CMU Ocker Hill Ocker Hill +1 more DY4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
83.08 MW
Land at North Road, Vauxhall, Ellesmere Port, CH65 1BA (1 component) Geocoding Needed

22.5MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Reciprocating engines Peel L&P Energy Limited New Build Generating CMU Ellesmere Port North Road Balancing Services Plant Not Prequalified CH65
Active • 2024-25 (T-4)
21.43 MW
Land at Newburn Haug Industrial Estate, Riversdale Way, Newcastle Upon Tyne, NE15 8SG (1 component) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Newburn Not Prequalified NE15
Active • 2025-26 (T-4)
6.68 MW
Land at Neander, Lichfield Road Industrial Estate, Tamworth, B79 7XA, Tamworth (8 components) Geocoding Needed

New reciprocating gensets in acoustic enclosure

Active • 2024-25 (T-4)
7.46 MW
Land at Neander, Lichfield Road Industrial Estate, Tamworth B79 7XA Tamworth (8 components)

New reciprocating gensets in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Neander Not Prequalified B79
Active • 2024-25 (T-4)
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components) Geocoding Needed
• A Battery Energy Storage System
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant
Reciprocating engines Storage (Duration 2h) HD777FRY LTD New Build Generating CMU Fryston Fryston +1 more LS25
Active • 2025-26 (T-4), 2024-25 (T-4)
92.81 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (2 components) Geocoding Needed

A Battery Energy Storage System.

Reciprocating engines Storage (Duration 8h) HB411MIN LTD New Build Generating CMU Dogtrap Minety SN16
Active • 2028-29 (T-4), 2024-25 (T-4)
87.16 MW
Loading map...
Showing 25 locations