Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

689 unique locations (1847 components) - Page 14 of 28

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
LAND NORTH OF FINMERE ROAD EASTBOURNE BN22 8QJ (2 components)

CMU consisting of multiple reciprocating engines and alternators (2)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Finmere Power Not Prequalified BN22
Inactive • 2021-22 (T-1), 2020-21 (T-1)
LAND LYING TO THE SOUTH OF WEST QUAY ROAD, WINWICK, WA2 8TL (3 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.33 MW
LAND LYING TO THE SOUTH OF WEST QUAY ROAD WINWICK WA2 8TL (1 component)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Bullard Power Not Prequalified WA2
Inactive • 2020-21 (T-1)
Land lying to the north of Salisbury Road, Ringwood, BH24 1AL (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
Land just north of the railway line, High Middlefield Farm, Durham Road, Thorpe Thewles, TS21 3LS (2 components)

Gas peaking reciprocating engine

Reciprocating engines NORTON POWER LIMITED New Build Generating CMU Norton Power 001 Norton Power 028 Conditional TS21
Inactive • 2022-23 (T-4), 2020-21 (T-4)
94.55 MW
LAND EAST OF PILSWORTH ROAD, ROCHDALE, HEYWOOD, OL10 2TA (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.80 MW
LAND EAST OF PILSWORTH ROAD ROCHDALE HEYWOOD OL10 2TA (2 components)

CMU consisting of multiple reciprocating engines and alternators (2)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Pilsworth Power OL10
Inactive • 2021-22 (T-1), 2020-21 (T-1)
Land east of Nottingham Road, Loughborough, Leicestershire, LE11 1ET (2 components)

3 X 2MW gas fuelled generators installed on a compound on land east of Nottingham Road

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
Land east of Nottingham Road, Loughborough, Leicestershire, LE11 1ET (2 components)

3 X 2MW gas fuelled generators installed on a compound on land east of Nottingham Road (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land east of Griffiths Road, Northwich, CW9 7PL (2 components)

2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.

Reciprocating engines Griffiths Road Energy Centre Limited New Build Generating CMU Not Prequalified CW9
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
Land East of Edgemoor, Titchsborough Hill, Otterham Down, Camelford, Cornwall, PL32 9XU (1 component)

A 20MW power generating unit comprising multiple reciprocating engines.

Reciprocating engines FIRST RENEWABLE ALPHA LIMITED Existing Generating CMU Bygen Power (Tregreen) PL32
Inactive • 2019-20 (T-1)
19.03 MW
Land east of Corporation Road, Rochdale, OL11 4HJ (2 components)

10 x 2MW gas fuel generators to be installed in a compound on land east of Corporation Road.

Reciprocating engines BRIMROD ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified OL11
Inactive • 2023-24 (T-4), 2022-23 (T-3)
19.00 MW
Land East of Cash Lane, Fordsham, WA6 0TZ (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected WA6
Inactive • 2022-23 (T-4)
1.90 MW
LAND BEING PART OF PIPSMORE FARM, BRISTOL ROAD, CHIPPENHAM, SN14 0GA (3 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.97 MW
LAND BEING PART OF PIPSMORE FARM BRISTOL ROAD CHIPPENHAM SN14 0GA (1 component)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Bristol Power Not Prequalified SN14
Inactive • 2020-21 (T-1)
Land at Wood Farm, Swindon Road, Wroughton, Swindon, SN4 9BZ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
6.85 MW
LAND AT WEIGHBRIDGE ROAD, DEESIDE, CH5 2LL (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.82 MW
LAND AT WEIGHBRIDGE ROAD DEESIDE CH5 2LL (2 components)

CMU consisting of multiple reciprocating engines and alternators (2)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Bear Power Not Prequalified CH5
Inactive • 2021-22 (T-1), 2020-21 (T-1)
Land at Warne Road, Western-super-Mare, BS23 3TP (3 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Land at Union Street, Masbrough, Rotherham S61 1AA Rotherham (4 components)

Reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED Existing Generating CMU Union Street S61
Inactive • 2021-22 (T-1)
Land at Thornton Lane, Markfield, LE67 9TU (3 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
• 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
56.82 MW
Land at the corner of Hull Road and Salt End Lane, HU12 8PP (4 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
141.33 MW
Land at Strasbourg St, Westwood Industrial Estate, Margate, Kent, CT9 4JF (5 components)
• 20.7MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20.7MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Reciprocating engines WESTWOOD POWER LIMITED New Build Generating CMU Westwood Power Westwood Power +1 more CT9
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
58.09 MW
Land at Strasbourg St, Westwood Industrial Estate, Margate CT9 4JP (1 component)

20 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines WESTWOOD POWER LIMITED New Build Generating CMU Westwood Power Conditional CT9
Inactive • 2022-23 (T-4)
18.84 MW
Land at Stainburn Road, Stainburn Road, Great Clifton, Derwent Vale, CA14 1TG (6 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines SWB Power Ltd New Build Generating CMU ENDERBY1 STAINBURN ROAD +2 more CA14
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
22.81 MW
Loading map...
Showing 25 locations