Reciprocating engines

517 unique locations (2572 components) - Page 17 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
Dewi Road, Tregaron, SY25 6JP (2 components)

STOR diesel engines that will operate environmentally with mixed fuel

Reciprocating engines GFI TREGARON LTD Existing Generating CMU Tregaron SY25
Active • 2025-26 (T-1), 2024-25 (T-1)
12.42 MW
Devon Street, Birmingham, B7 4TH (6 components)

A gas fuelled generating station.

Reciprocating engines AVE 003 Limited AVE 003 LIMITED New Build Generating CMU Devon Street Devon Street +2 more Not Prequalified B7
Active • 2025-26 (T-4), 2024-25 (T-4) ...
20.00 MW
Dering Way, Gravesend, Kent, DA12 2QX (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Dering Way, Gravesend, Kent.

Active • 2024-25 (T-4)
15.24 MW
Dering Way, Gravesend, Kent, DA12 2QX (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Dering Way, Gravesend, Kent.

Reciprocating engines RELIANCE ENERGY LIMITED New Build Generating CMU Not Prequalified DA12
Active • 2024-25 (T-4)
Davy Drive, Peterlee, SR8 2JF (7 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
26.64 MW
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QG (5 components)

10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines DAFEN RESERVE POWER LIMITED Existing Generating CMU Dafen Power Limited Dafen Reserve Power Limited +3 more SA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.42 MW
Cut Throat Lane, Witham, Essex, CM8 2SZ (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.02 MW
Currock Trade Centre, Currock, Carlisle, Cumberland, England, CA2 5AD (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Currock 1 Currock 2 CA2
Active • 2028-29 (T-4)
14.96 MW
Currock Trade Centre, Currock, Carlisle, Cumberland CA2 5AD (2 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 140 Ltd New Build Generating CMU CA2
Active • 2028-29 (T-4)
14.96 MW
Currock Road, Carlisle, Cumbria CA2 5AD (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 141 LTD New Build Generating CMU Bog Bog +1 more CA2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Cunliff Road, Blackburn, BB1 5SX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Blackburn Not Prequalified BB1
Active • 2025-26 (T-4)
6.68 MW
Crosby Power, Church Street, Bootle, L20 1AF (4 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Crosby Power Crosby Power L20
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.88 MW
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (3 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Stephenson Power Stephenson Power Not Prequalified CO4
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.41 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Cowley Hill Power Station Cowley Hill Power Station +8 more WA10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
72.67 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (4 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Reciprocating engines Storage (Duration 3h) FRP MERCIA HOLDCO LIMITED New Build Generating CMU Common Lane Common Lane S63
Active • 2028-29 (T-4), 2025-26 (T-1) ...
15.52 MW
Commercial Road, Bromborough, Birkenhead, Wirral, CH62 3NL (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Commercial Road, Bromborough Birkenhead, Wirral.

Active • 2024-25 (T-4)
19.04 MW
Commercial Road, Bromborough, Birkenhead, Wirral CH62 3NL (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Commercial Road, Bromborough Birkenhead, Wirral.

Reciprocating engines RELIANCE ENERGY LIMITED New Build Generating CMU Not Prequalified CH62
Active • 2024-25 (T-4)
Collyland Road, Fishcross, FK10 3JN (2 components)

A new build, gas fuelled generation station.

Reciprocating engines FISHCROSS GENERATION LIMITED New Build Generating CMU Fishcross Fishcross Not Prequalified FK10
Active • 2025-26 (T-4), 2024-25 (T-4)
42.91 MW
Clay Tye Rd, Cranham, London Borough of Havering, RM14 3PL, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Warley20 Not Prequalified RM14
Active • 2024-25 (T-4)
46.18 MW
CLAYDON BUSINESS PARK, GIPPING ROAD, GREAT BLAKENHAM, IPSWICH, IP6 0NL (1 component)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
2.41 MW
Claverhouse Industrial Estate, Dundee, DD4 9QH (4 components)

A new build, gas fuelled generation station.

Reciprocating engines CLAVERHOUSE GENERATION LIMITED New Build Generating CMU Claverhouse Generation Limited Claverhouse Generation Limited +1 more DD4
Active • 2024-25 (T-4), 2023-24 (T-4) ...
56.88 MW
Church Field Road, Sudbury, CO10 2YA (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED GREAT DUNMOW POWER LIMITED New Build Generating CMU Sudbury Sudbury A +1 more Not Prequalified CO10
Active • 2025-26 (T-4), 2024-25 (T-4)
20.30 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (8 components)

4 x reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.80 MW
Loading map...
Showing 25 locations