Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
32.77 MW
Booth Lane, Sandbach, Cheshire, CW11 3PY (1 component)

A new build gas fuelled generating station.

Active • 2026-27 (T-4)
42.83 MW
Booth Lane, Sandbach, Cheshire CW11 3PY (1 component)

A gas fueled distribution connected generating station

Reciprocating engines BLUEFIELD ENERGY LIMITED New Build Generating CMU BOOTH28 Rejected CW11
Active • 2028-29 (T-4)
23.37 MW
Booth Lane Sandbach Cheshire CW11 3PY (1 component)

A new build gas fuelled generating station.

Reciprocating engines SEDG (MINERS) LTD New Build Generating CMU Booth Lane Not Prequalified CW11
Active • 2026-27 (T-4)
42.83 MW
Booker Cash and Carry, Frobisher Way, Hatfield, Hertfordshire, AL10 9TR (9 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.99 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Hatfield Peak Gen Power Hatfield +2 more AL10
Active • 2024-25 (T-1), 2023-24 (T-1) ...
9.19 MW
Booker Cash and Carry, Didcot, OX11 7HJ (6 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.58 MW
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (6 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.81 MW
Bond Avenue, Bletchley, Milton Keynes, MK1 1JJ (5 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2021-22 (T-1) ...
16.97 MW
Blankenham Nursery, Great Blankenham, Bramford, Ipswich, Suffolk, IP8 4JU (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bramford Not Prequalified IP8
Active • 2027-28 (T-4)
6.79 MW
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (4 components)
• 3 x 1MW / 1.2 MWh BYD Lithium Ion Battery
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.90 MW
Bevercotes Energy Park West Drayton Avenue Bevercotes Nottinghamshire DN22 8DB (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio DN22
Active • 2024-25 (T-1)
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (4 components)
• A 7.5MW new build gas generating station..
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
19.78 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (2 components)

A 7.5MW new build gas generating station..

Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU FERRY1 FERRY1 NG17
Active • 2026-27 (T-4), 2025-26 (T-1)
14.15 MW
Bentinck Electricity Generating Plant, Mill Lane, Kirkby In Ashfield, Nottinghamshire, NG17 9LG (2 components)

Gas engine peaker plant providing capacity market, power trading and other balancing services.

Active • 2024-25 (T-4), 2021-22 (T-1)
11.43 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Reciprocating engines Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Belvedere A Belvedere B Not Prequalified MK17
Active • 2025-26 (T-4)
7.33 MW
Batleys Cash and Carry, Talbot Road, Fareham, PO15 5RY (9 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.67 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (4 components)

The CMU component is net of the auxiliary power required (3)

Reciprocating engines W4B RENEWABLE ENERGY LIMITED Existing Generating CMU W4B 2020 16MW W4B 2020 16MW +2 more PO15
Active • 2024-25 (T-1), 2023-24 (T-1) ...
33.85 MW
Batleys Cash and Carry, Gielgud Way, Coventry, CV2 2SZ (9 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
39.68 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Coventry Peak Gen Power Coventry +2 more CV2
Active • 2024-25 (T-1), 2023-24 (T-1) ...
11.31 MW
Balle Street, Darwen, Blackburn BB3 2AZ (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 130 LTD New Build Generating CMU Balle Balle +1 more Conditional BB3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (17 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.88 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (6 components)

Gas reciprocating engines (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
1.85 MW
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Reciprocating engines OCGT and Reciprocating Engines SWB Power Ltd New Build Generating CMU Aspatria BP Not Prequalified CA7
Active • 2024-25 (T-4), 2021-22 (T-4)
4.85 MW
1.37 MW
Loading map...
Showing 25 locations