Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

729 unique locations (5546 components) - Page 2 of 30

Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2018-19 (T-1), 2020-21 (T-4) ...
44.21 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (14 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive •
Watling Road Bishop Auckland DL14 9AS (5 components)

New build power station comprised of multiple reciprocating engines.

Inactive •
Waterswallows Lane, Buxton, SK17 7HP (2 components)
Inactive •
Waterswallows Lane, Buxton, Derbyshire SK17 7JD (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Inactive •
Warne Road, Weston Super-Mare, BS23 9JZ (2 components)

New-build gas reciprocating engine.

Active • 2028-29 (T-4)
37.96 MW
Visitors Car Park, Alexandra Park, WA10 3UJ (5 components)
• Diesel or gas generating station.
• gas generating station.
Inactive •
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site

Active • 2023-24 (T-4), 2024-25 (T-4) ...
8.06 MW
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (4 components)
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Inactive •
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (9 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive •
Unit D Kendale Road Scunthorpe DN16 1DT (19 components)

New build power station comprised of multiple reciprocating engines.

Inactive •
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (25 components)
• Gas reciprocating engine
• Peak power plant
Inactive •
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2018-19 (T-1), 2020-21 (T-4) ...
29.08 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Inactive •
Loading map...
Showing 25 locations