Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

730 unique locations (5551 components) - Page 22 of 30

Fort Parkway Heartlands Birmingham B24 9QT (9 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Inactive •
Former site of building 23, QinetiQ Portsdown Technology Park, Southwick Rd, Portsmouth PO6 3RU (1 component)

20 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive •
Former Fylde Coast Ice Arena Bristol Avenue FY2 0JF (6 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive •
Five Mile Drive, Upton Wold, Moreton-In-Marsh, WR12 7LD (8 components)
• New build site with gas reciprocating engines to replace diesel plant
• New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
• STOR diesel engines that will operate environmentally with mixed fuel
Inactive •
Ffordd Penamser Road, Porthmadog, Gwynedd, LL49 9GB (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive •
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Inactive •
Felindre Rd, Pencoed, Bridgend, CF35 5HU (1 component)

A new build, gas fuelled generation station

Inactive •
Factory Lane Croydon Surrey CR0 3LE (1 component)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive •
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (32 components)
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on-site Nursery.
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Inactive •
E.r.f Way, Middlewich CW10 0QJ (11 components)

Gas fired reciprocating engines

Inactive •
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (9 components)

CMU consisting of multiple gas reciprocating engines and alternators

Inactive •
Ellifoot Lane, Burstwick, HU12 9EB (8 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Inactive •
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (4 components)

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Inactive •
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Balance Power Limited - PPG Supporting Letter" for further clarity) (4 components)

A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.

Inactive •
Eagle Business Park, Yaxley, PE7 3GP (16 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive •
Loading map...
Showing 25 locations