Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

902 unique locations (6047 components) - Page 3 of 37

Units 13 and 14, Ashmount Business Park, Upper Forest Way, Swansea Enterprise Park, Swansea, SA6 8QR (1 component)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive •
Units 1-11, 16 and 17 Sandhurst, Kings Road, Canvey Island (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive •
Unit D Kendale Road Scunthorpe DN16 1DT (19 components)

New build power station comprised of multiple reciprocating engines.

Inactive •
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (25 components)
• Gas reciprocating engine
• Peak power plant
Inactive •
Unit 2 Northside, Freightliner Road, Brighton Road Industrial Estate, Hull HU3 4UW (2 components)

10 x 2MW new recip gas engines in a peaking plant environment, with a planned 15+ year lifespan. The installation and O&M put in place will meet the extended years …

Inactive •
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2018-19 (T-1), 2020-21 (T-4) ...
29.08 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Inactive •
Unit 27A Aber park Aber Road Flint CH6 5EX (18 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive •
Unit 27A Aber park Aber Road Flint CH6 5EP (21 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive •
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (20 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2022-23 (T-4), 2023-24 (T-4) ...
15.06 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (26 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive •
Unit 1B Britannia Business Park, Union Road BL2 2HP (1 component)

Gas reciprocating engine(s)

Inactive •
Unit 1-3, 135A Business Park, Armoury Road, Small Heath, Birmingham, B11 2RQ (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive •
Union Street, Manchester, M27 4HL (4 components)
Inactive •
Tweedale Way, Oldham OL9 8EH (9 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive •
Trumps Farm Landfill Site Kitsmead Lane Chertsey Surrey KT16 0DS (7 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engines
Inactive •
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (20 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive •
Tring Road, Tring, HP23 4RA (11 components)
• 10 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
Inactive •
Loading map...
Showing 25 locations