Reciprocating engines

691 unique locations (1851 components) - Page 6 of 28

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Redscar Industrial Estate, Longridge Rd, Preston PR2 5LX (2 components) Geocoding Needed

Gas fired reciprocating engines

Reciprocating engines CONRAD (REDSCAR) LIMITED New Build Generating CMU Redscar A Redscar B Not Prequalified PR2
Inactive • 2019-20 (T-1)
38.06 MW
Recycling Centre, Meek Street, Rochdale, OL2 6HL (1 component) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
4.76 MW
Rear Grazing Land, Crescent Industrial Estate, Station Road, Southampton SO16 0YD (1 component) Geocoding Needed

20 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Nursling Power Limited New Build Generating CMU Nursling Power Conditional SO16
Inactive • 2022-23 (T-4)
18.84 MW
Rampworx, 1-3 Leckwith Road, Bootle L30 6UE (1 component) Geocoding Needed

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected L30
Inactive • 2022-23 (T-4)
1.90 MW
Rampside Road, Roosecote, Near Barrow-in-Furness, Cumbria LA13 0PQ (3 components) Geocoding Needed

A Prospective New Build Gas reciprocating energy reserve facility

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU Roosecote DG Roosecote DG +1 more Conditional LA13
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
138.27 MW
Queens Road, Immingham, DN40 1QN (3 components) Geocoding Needed

16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines IMMINGHAM POWER LIMITED Existing Generating CMU Immingham Power DN40
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
15.01 MW
Prowse's Lane, Axbridge, BS26 2HP (3 components) Geocoding Needed
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines SWB Power Ltd New Build Generating CMU AXBRIDGE AXBRIDGE Conditional BS26
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
13.31 MW
Prospect House, Sandycroft, Deeside, CH5 2QJ (8 components) Geocoding Needed
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.02 MW
Prospect House Sandycroft Deeside CH5 2QJ (3 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (SANDYCROFT) LIMITED New Build Generating CMU Conrad (Sandycroft) Limited Conrad (Sandycroft) Limited +1 more CH5
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Private Road No.5, Colwick, Nottingham, NG4 2JU (4 components) Geocoding Needed

New reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Private Road No.5 (11) Private Road No.5 (11) +2 more NG4
Inactive • 2020-21 (T-4), 2019-20 (T-1)
37.37 MW
Pringle Street, Blackburn, BB1 1SA (4 components) Geocoding Needed

A gas fuelled generating station.

Reciprocating engines AVE 006 Limited New Build Generating CMU Pringle Street A Pringle Street B Not Prequalified BB1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
Port Talbot, Port Talbot Works, SA13 2NG (6 components) Geocoding Needed
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
74.11 MW
Pontefract Road, Stourton, Leeds, LS10 1AZ (2 components) Geocoding Needed

New reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Pontefract Rd Pontefract Rd LS10
Inactive • 2020-21 (T-4), 2019-20 (T-1)
12.94 MW
Plymouth Energy Park (Former Toshiba Site), Ernsettle Lane, Plymouth. PL5 2EY, Note: OS ref SX446601, postcode PL5 2EY, and postcode PL5 2TT and PL5 2TS all relate to the same site. Postcode is ambiguous as site has not been allocated a postcode by the post office at the current time). (5 components) Geocoding Needed
• The site consists of 48 diesel generators.
• This is an additional CMU component in addition to the existing 20MW diesel plant on the site. This CMU has been created on the basis of a recent bid to convert part of this plant to provide EFR. If that bid is successful then this CMU will be used to apply to provide CM services from the upgraded site. If the EFR bid is unsuccessful this CMU application may be withdrawn and the existing CMU used. The CMU will be based in a diesel/battery hybrid configuration providing 10MW of generation. The plant will be produced through an upgrade of the existing diesel site.
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
67.79 MW
Plymouth Energy Park (Former Toshiba Site), Ernsettle Lane, Plymouth. PL5 2EY Note: OS ref SX446601, postcode PL5 2EY, and postcode PL5 2TT and PL5 2TS all relate to the same site. Postcode is ambiguous as site has not been allocated a postcode by the (4 components)
• The site consists of 48 diesel generators. (2)
• This is an additional CMU component in addition to the existing 20MW diesel plant on the site. This CMU has been created on the basis of a recent bid to convert part of this plant to provide EFR. If that bid is successful then this CMU will be used to apply to provide CM services from the upgraded site. If the EFR bid is unsuccessful this CMU application may be withdrawn and the existing CMU used. The CMU will be based in a diesel/battery hybrid configuration providing 10MW of generation. The plant will be produced through an upgrade of the existing diesel site.
Reciprocating engines Keystone Power Limited Existing Generating CMU Keystone EFR Plymouth +1 more PL5
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Plot N2C, Castle Road, Sittingbourne, ME10 3SQ (5 components) Geocoding Needed
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2022-23 (T-1) ...
34.27 MW
Plot N2C, Castle Road, Sittingbourne, ME10 3SQ (3 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export. (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (SITTINGBOURNE) LIMITED New Build Generating CMU SITTINGBOURNE POWER SITTINGBOURNE POWER +1 more ME10
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Plot G11, Bennett St, Bridgend Industrial Estate, Bridgend, CF31 3RS (2 components) Geocoding Needed

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional CF31
Inactive • 2022-23 (T-4)
19.03 MW
Plot D, Faraday Business Park, Solent Airport, Daedalus, Lee-on-the-Solent, Hampshire, PO13 9FW (2 components) Geocoding Needed

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Vulcan Power Limited New Build Generating CMU Vulcan Power Not Prequalified PO13
Inactive • 2023-24 (T-4), 2022-23 (T-3)
18.81 MW
Plot B Land at Severn Road Avonmouth BS10 7SE (1 component) Geocoding Needed

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Reciprocating engines FPC INDUSTRY & ENTERPRISE 2 LIMITED New Build Generating CMU Severn Road 7 Not Prequalified BS10
Inactive • 2023-24 (T-4)
14.25 MW
Plot A3, Watervole Way, Doncaster, DN4 5JP (2 components) Geocoding Needed
• A 20MW new build gas generating station..
• A new build gas generating station.
Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU PENRITH2 DN4
Inactive • 2020-21 (T-4), 2019-20 (T-1)
37.86 MW
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (4 components) Geocoding Needed
• A 20MW New Build gas fuelled generating station.
• A 8MW New Build gas fuelled generating station.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) A.E. MORRIS LIMITED New Build Generating CMU SKIRBY SKIRBY +1 more Conditional WF9
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
34.17 MW
Loading map...
Showing 25 locations