Storage (Duration 2h)

362 unique locations (1367 components) - Page 1 of 15

Wright Street, Paisley, Renfrew, PA4 8AN (2 components)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
20.94 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
34.25 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (5 components)
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1)
6.23 MW
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (15 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (2 components)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
7.54 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (2 components)

Battery energy storage system

Active • 2028-29 (T-4)
20.90 MW
Wellington Street, Oldham, Lancashire OL4 1SA (6 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
29.30 MW
Welkin Road, Bredbury, SK6 2BH (4 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.79 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (18 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
66.68 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system.
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2027-28 (T-4), 2025-26 (T-1)
18.20 MW
Uskmouth Power Station, West Nash Road, Newport, NP18 2BZ (4 components)

115MW battery energy storage system on a shared transmission connection

Active • 2028-29 (T-4)
32.25 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (2 components)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
40.20 MW
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon

Active • 2025-26 (T-4), 2023-24 (T-1)
13.65 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW1, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
23.96 MW
Todrig Farm Coldstream TD12 4JA (4 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and …

Active • 2028-29 (T-4)
71.20 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (1 component)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)

Active • 2025-26 (T-1)
13.55 MW
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (2 components)

Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.

Active • 2028-29 (T-4), 2025-26 (T-1)
10.79 MW
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
15.04 MW
Loading map...
Showing 25 locations