Storage (Duration 6h)

3 unique locations (64 components)

Active MW: 5317.76 MW
Inactive MW: 0.00 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park. (2)

Storage (Duration 6h) Storage (Duration 9h) LOGI ENERGY LIMITED New Build Generating CMU Not Prequalified B96
Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (2 components)
• The CRYOBattery? is the world?s first commercial-scale Cryogenic Energy Storage system. The technology uses surplus electricity to condense atmospheric air into a liquid. The CRYOBattery? has an output of 49.9 MW which can be sustained for up to six hours (300 MWh).
• The project is the world?s first commercial-scale Liquid Air Energy Storage (LAES) system. The technology uses surplus electricity to condense atmospheric air into a liquid. The project has an output of 49.9 MW which can be sustained for up to six hours (300 MWh).
Storage (Duration 6h) CRYOBATTERY ONE LIMITED New Build Generating CMU Cryobattery01 Cryobattery01 M31
Active • 2028-29 (T-4), 2025-26 (T-4)
31.27 MW
Loading map...
Showing 3 locations