Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 0.5h)

37 unique locations (319 components) - Page 2 of 2

Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Active • 2024-25 (T-4), 2022-23 (T-4) ...
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (5 components)

49.99MW Lithium-ion Energy Storage System

Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.60 MW
Carnegie Road, Liverpool, L13 7HY. (5 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Carnegie Road, Liverpool, L13 7HY (2 components)

The CMU comprises lithium ion batteries housed in ISO containers used to house the converters

Active • 2025-26 (T-1)
2.73 MW
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (7 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Amersham Road Denham Buckinghamshire SL9 7AW (7 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
27.86 MW
Amersham Road Denham Buckinghamshire SL9 7AW (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
3.01 MW
Albion Road, Dartford, Kent, DA1 5PZ (13 components)

battery storage (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
37.65 MW
AB51 (98 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
140.87 MW
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready … (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
7.16 MW
Loading map...
Showing 12 locations