Storage (Duration 1.5h)

6 unique locations (62 components)

Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (14 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.59 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 30MW New Build Battery Storage site
• A New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Little Raith Farm, Auchtertool, Fife, KY5 0AX (9 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
36.65 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (11 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.87 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (14 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
0.57 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.64 MW
Loading map...
Showing 6 locations