Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

106 unique locations (369 components) - Page 1 of 5

Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (12 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
44.65 MW
Atcost Road, Barking Riverside, London, England, IG11 0EQ (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
12.87 MW
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site

Active • 2028-29 (T-4), 2027-28 (T-4)
7.89 MW
Blandford Road, Poole, BH16 6AB (5 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
4.44 MW
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (3 components)

New build battery storage

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, HP27 9RE (1 component)

New 49.5MW Battery Energy Storage system

Active • 2025-26 (T-4)
53.16 MW
8.87 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
• An 87.500 MW Battery Storage Site Component.
• An 87.500 MW New Build Battery Storage Site Component
• An 87.500 MW New Build Battery Storage Site Component.
Active • 2028-29 (T-4)
55.20 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (8 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
36.65 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (12 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
36.65 MW
Clay Tye Road, Upminister, RM14 3PL (8 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Active • 2025-26 (T-4), 2024-25 (T-4) ...
36.65 MW
Craigie, South Ayrshire, Scotland, KA1 5JT (3 components)

A 175MW New Build Battery Storage Site Component

Active • 2027-28 (T-4)
60.48 MW
Draycott Cross Road, Cheadle, ST10 1PN (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Active • 2027-28 (T-4)
4.61 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (4 components)

New Build Battery Storage Facility

Active • 2026-27 (T-4), 2025-26 (T-1) ...
39.88 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF. (4 components)
• 25MW Lithium-ion Energy Storage System
• 99.9MW Lithium-ion Energy Storage System
Active • 2027-28 (T-4)
28.78 MW
Kilwinning, North Ayrshire, Scotland, KA13 7RU, United Kingdom (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
4.71 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV.

Active • 2026-27 (T-4), 2025-26 (T-1)
17.75 MW
Land 260m to the southwest of Alness Grid Sub Station, Mid Balnacraig, Alness, Highlands, Scotland IV17 0YA (1 component)

Standalone Battery Storage on greenfield land near Alness substation

Active • 2027-28 (T-4)
4.78 MW
Loading map...
Showing 25 locations