Land 75 metres southeast of Camas House Fairways Business Park Inverness, IV2 6AA (2 components)

Battery energy storage facility comprising access track, compound of battery & electrical equipment, meter building, stores, fencing, security cameras, and associated landscaping

Active • 2027-28 (T-4)
9.56 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 component)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active • 2026-27 (T-4)
6.68 MW
Land adjacent to Wakefield B Substation Doncaster Road Wakefield WF1 5DB (1 component)

New 99.9 MW Battery Energy Storage system

Active • 2025-26 (T-4)
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.86 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (7 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.85 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (14 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.59 MW
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.89 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
10.37 MW
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system

Active • 2025-26 (T-4), 2024-25 (T-1)
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system.

Active • 2027-28 (T-4), 2026-27 (T-4)
7.85 MW
Land at West Road, Trafford Park, M41 7SW (7 components)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.89 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (5 components)
• New Build Battery Energy Storage system (2)
• New Build 49.99 MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.28 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system

Active • 2027-28 (T-4), 2026-27 (T-4)
3.08 MW
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE (1 component)

49.9MW lithium ion battery energy storage located at Berkswell near Coventry

Active • 2028-29 (T-4)
7.87 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.09 MW
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
• A New Build Distribution Connected Battery Energy Storage System.
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2027-28 (T-4), 2026-27 (T-4)
5.70 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (2 components)
• A 46.000 MW / 69.00 MWh battery energy storage system
• A 47.500 MW / 71.250 MWh battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4)
7.49 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (7 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.20 MW
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
• New Build 99.9 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
12.31 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...