Lower Langage Farm, Kingsway, Plympton Plymouth PL7 5AW (1 component)

Battery Storage system to be installed at Langage Solar Park

Active • 2027-28 (T-4)
0.58 MW
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.27 MW
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
6.26 MW
Minchens Lane Bramley RG7 2NL (3 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
8.99 MW
Netherlands Way, Stallingborough, DN41 8DF (2 components)

New build battery storage facility

Active • 2026-27 (T-4)
14.22 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (6 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.77 MW
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 component)

New build battery storage facility.

Active • 2026-27 (T-4)
7.11 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (11 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.87 MW
Potman's Lane, Battle, TN33 9BL (6 components)
• A Battery Energy Storage System
• A Battery Energy Storage System, which has already PQ'd as POTM25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.11 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.03 MW
4.78 MW
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL (1 component)

New Build Battery Energy Storage System

Active • 2028-29 (T-4)
27.37 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site

Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.63 MW
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export capacity of 50MVA.
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export capacity of at least 42MVA.
Active • 2026-27 (T-4), 2025-26 (T-4)
7.46 MW
Rusholme Grange, Drax, YO8 8PW (5 components)
• Lithium-ion Battery Energy Storage System
• New build 35MW Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1) ...
25.91 MW
17.59 MW
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Active • 2027-28 (T-4)
5.75 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (14 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
0.57 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
The Phoenix Centre, Beaumont Road, Banbury, OX16 1RH (1 component)

Battery Energy Storage System

Inactive • 2022-23 (T-4)