Storage (Duration 1h)

58 unique locations (296 components) - Page 1 of 3

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT05 BATT05 LE12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.98 MW
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of … (3)

Storage (Duration 1h) FS WEST GOURDIE LIMITED New Build Generating CMU FSWG23 DD2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.10 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (12 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.10 MW
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
15.79 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Active • 2025-26 (T-4), 2024-25 (T-1)
2.38 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) CORPOWER LIMITED New Build Generating CMU Corpower Corpower +3 more Not Prequalified SS17
Active • 2025-26 (T-4), 2024-25 (T-1)
8.21 MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (1 component)

47.000MW standalone battery energy storage project

Active • 2024-25 (T-1)
5.33 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken. (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Storage (Duration 1h) Storage (Duration 1.5h) THRIVE RENEWABLES (WICKEN) LIMITED Existing Generating CMU Wicken Wicken +3 more Rejected MK19
Active • 2026-27 (T-4), 2024-25 (T-1) ...
2.01 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system at Richborough Energy Park
• Battery Energy Storage System
• Battery energy storage system at Richborough Energy Park
Storage (Duration 1h) RICHBOROUGH ENERGY PARK LIMITED Existing Generating CMU PGREP1 PGREP1 CT13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.03 MW
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• battery energy storage system
Storage (Duration 1h) RICHBOROUGH ENERGY PARK LIMITED Existing Generating CMU PGREP2 PGREP2 CT13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.03 MW
Potman's Lane, Battle, TN33 9BL (5 components)
• A Battery Energy Storage System (2)
• A Battery Energy Storage System, which has already PQ'd as POTM25
Storage (Duration 1h) Storage (Duration 1.5h) BRK 002 LIMITED BRK 002 LIMITED New Build Generating CMU Potmans Lane Potmans Lane +3 more TN33
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.67 MW
Potash Farm, Nash Road, Beachampton, MK19 6EA (6 components)

49.900MW one-hour duration battery energy storage facility. (3)

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Stony A Stony A +4 more MK19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.92 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Plot B at Severn Road Avonmouth BS10 7SE (4 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Storage (Duration 1h) Hallen Energy Ltd Existing Generating CMU New Build Generating CMU NB_308 NB_308 BS10
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.50 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components)

Battery storage plant (3)

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.04 MW
Parcel Of Land Within Norwich Road Industrial Estate West Of Halesworth Business Centre , Norwich Road, Halesworth, Suffolk, IP19 8QJ (4 components)

50MW Lithium-ion Energy Storage System (3)

Storage (Duration 1h) SUSI EELPOWER HALESWORTH LIMITED New Build Generating CMU HALE22 HALE22 +1 more IP19
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.69 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.51 MW
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
• 50MW/50MWh one hour battery (2)
• 50MW/50MWh one hour battery storage
Active • 2026-27 (T-4), 2025-26 (T-1) ...
27.52 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
• A 40MW New Build Battery Storage site (2)
• A 45MWh New Build Battery Storage site
Storage (Duration 1h) Storage (Duration 1.5h) STAIRFOOT GENERATION LTD New Build Generating CMU Stairfoot 1 Stairfoot 1 +3 more S71
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.78 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (2 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (2)

Storage (Duration 1h) NORWICH EAST ELECTRIC FORECOURT LTD New Build Generating CMU Norwich East Electric Forecourt Norwich East Electric Forecourt NR13
Active • 2026-27 (T-4), 2024-25 (T-1)
1.37 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (4 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (3)

Storage (Duration 1h) NORWICH EAST ELECTRIC FORECOURT LTD New Build Generating CMU Norwich East Electric Forecourt Norwich East Electric Forecourt +2 more NR13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.57 MW
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
DSR Storage (Duration 1h) FAREHAM ENERGY RESERVE 2 LIMITED LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU FAR226 PO14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.42 MW
Loading map...
Showing 25 locations