1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.14 MW
60-70 Reach Road Burwell CB25 0AH (5 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
29.34 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (20 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
55.97 MW
Bilton Farm, Preston Road, Hull, HU11 4DZ (24 components)
• Battery Energy storage linked to solar farm
• Solar farm
Active • 2024-25 (T-4), 2023-24 (T-1) ...
10.34 MW
Boscar Grange Farm York YO61 3NQ (14 components)

Battery Energy Storage system operating alongside solar farm

Active • 2025-26 (T-1), 2024-25 (T-4) ...
19.91 MW
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (16 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.35 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (16 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.27 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (11 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (14 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.61 MW
Dairy Lane Westhamnett Chichester PO20 2BG (8 components)

4MW battery co-located with a solar farm

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.51 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (125 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.67 MW
Forest Lane, Alne, York, YO61 1TU (1 component)

1x 2.000MW 1 hour Energy Storage System

Active • 2024-25 (T-4)
0.50 MW
47.60 MW
Land at Sterte Avenue West, Poole, BH15 2AL (24 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.01 MW
Land North of Clayhill Farm, Westoning MK45 5JD (8 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.30 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (12 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.28 MW
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (7 components)

New build storage facility

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.74 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (17 components)
• 17.315 MW installed capacity Battery Storage facility
• 19.6 MW Battery Storage facility
• 19.6 MW installed capacity Battery Storage facility with proven DSR capacity 19.083
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.68 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (6 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 50MW New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
31.39 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
243.40 MW
Loading map...
Showing 25 locations