Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

98 unique locations (474 components) - Page 1 of 4

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Whitelee Windfarm Extension, East Ayrshire, KA16 9LE (1 component)

1 x 50MW Lithium-ion battery with duration of 1 hour

Storage (Duration 1h) SCOTTISHPOWER RENEWABLES (UK) LIMITED New Build Generating CMU Whitelee Extension Not Prequalified KA16
Active • 2026-27 (T-4)
5.91 MW
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of … (3)

Storage (Duration 1h) FS WEST GOURDIE LIMITED New Build Generating CMU FSWG23 DD2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.10 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (12 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.10 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 1h) Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGHUL2 AGHUL2 +2 more SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS (2)
• BATTERY ENERGY STORAGE SYSTEM
Storage (Duration 1h) FAREHAM ENERGY RESERVE LIMITED Existing Generating CMU FAR123 FAR123 PO14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.84 MW
STOR Field 9, North Road, Inverkeithing, Fife, KY11 1HT (2 components)

49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing (2)

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU INVERKEITHING INVERKEITHING KY11
Active • 2026-27 (T-4), 2025-26 (T-4)
5.89 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (11 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
DSR Storage (Duration 1h) SUSI EELPOWER WINCHESTER LIMITED Existing Generating CMU WINP18 WINP18 +7 more SO22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.78 MW
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (1 component)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Storage (Duration 1h) STEVENAGE ELECTRIC FORECOURT LTD New Build Generating CMU Stevenage Electric Forecourt Rejected SG1
Active • 2026-27 (T-4)
0.71 MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (1 component)

30.000MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken. (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Storage (Duration 1h) Storage (Duration 1.5h) THRIVE RENEWABLES (WICKEN) LIMITED Existing Generating CMU Wicken Wicken +3 more Rejected MK19
Active • 2026-27 (T-4), 2024-25 (T-1) ...
2.01 MW
SEC, Stobcross Road, Scottish Event Campus, Stobcross, Glasgow, G3 8DG (2 components)

60MW / 60MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU SEC 1 SEC 2 Not Prequalified G3
Active • 2026-27 (T-4)
14.17 MW
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

Storage (Duration 1h) THE ISLE OF WIGHT ENERGY COMPANY LIMITED New Build Generating CMU Not Prequalified ST6
Active • 2026-27 (T-4)
0.30 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more Not Prequalified OL11
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.13 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (2 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
Active • 2026-27 (T-4)
8.27 MW
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.42 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Parcel Of Land Within Norwich Road Industrial Estate West Of Halesworth Business Centre , Norwich Road, Halesworth, Suffolk, IP19 8QJ (4 components)

50MW Lithium-ion Energy Storage System (3)

Storage (Duration 1h) SUSI EELPOWER HALESWORTH LIMITED New Build Generating CMU HALE22 HALE22 +1 more IP19
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.69 MW
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
• 50MW/50MWh one hour battery (2)
• 50MW/50MWh one hour battery storage
Active • 2026-27 (T-4), 2025-26 (T-1) ...
27.52 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (2 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (2)

Storage (Duration 1h) NORWICH EAST ELECTRIC FORECOURT LTD New Build Generating CMU Norwich East Electric Forecourt Norwich East Electric Forecourt NR13
Active • 2026-27 (T-4), 2024-25 (T-1)
1.37 MW
Loading map...
Showing 25 locations