Storage (Duration 1h)

29 unique locations (226 components) - Page 1 of 2

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)

Battery Storage Station (3)

Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGHUL2 AGHUL2 +2 more SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (11 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
DSR Storage (Duration 1h) SUSI EELPOWER WINCHESTER LIMITED Existing Generating CMU WINP18 WINP18 +7 more SO22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.78 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Storage (Duration 1h) FLEXITRICITY LIMITED Existing Generating CMU FLEX158 EX31
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.38 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (9 components)
• Battery Storage located at Grantham. (2)
• 7 MW of Battery Storage located at Grantham.
Storage Storage (Duration 1h) ESB SOLAR (NORTHERN IRELAND) LIMITED Existing Generating CMU Mill Farm MillFarm1 +6 more NG32
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)

Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (8 components)

Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating … (3)

Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ADSLS2 ADSLS2 +2 more BL9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (6 components)

Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGLAR2 AGLAR2 +1 more HR1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.94 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
• 17.315 MW installed capacity Battery Storage facility (2)
• 17.615 MW installed capacity Battery Storage facility
DSR Storage (Duration 1h) SUSI EELPOWER ROCK FARM LIMITED Existing Generating CMU ROCK18 ROCK18 +7 more SY8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.33 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +3 more ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)

Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. (2)

Storage (Duration 1h) NORTHWOLD SOLAR FARM LIMITED New Build Generating CMU Northwold Solar Farm BESS IP26
Active • 2028-29 (T-4), 2025-26 (T-1)
1.81 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (7 components)

CMU comprising of battery storage and associated plant (3)

Storage (Duration 1h) CONRAD (FLITWICK) LIMITED Existing Generating CMU Flitwick Flitwick +3 more MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.77 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (3 components)
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection (2)
• battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nursling SO16
Active • 2028-29 (T-4), 2023-24 (T-4) ...
0.63 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build two-hour duration battery storage (2)
• New build one-hour duration storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more ST10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (4 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) GRENDON LAKES STORAGE LIMITED New Build Generating CMU Grendon Lakes Storage Limited Grendon Lakes Storage Limited +2 more Not Prequalified NN7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.22 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)

Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 AGABS4 +2 more PR2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)

Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more CV37
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (3)

Storage (Duration 1h) E.ON UK PLC Existing Generating CMU NPCM-13 NPCM-13 +4 more PO20
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (7 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +4 more OX44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Carlton, Stockton-on-Tees, TS21 1EA (5 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Loading map...
Showing 25 locations