Storage (Duration 1h)

1 unique locations (14 components)

Back Lane, Chesterfield, S44 5XQ (14 components)
β€’ 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
β€’ 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
β€’ A Battery Energy Storage System.
Inactive β€’