Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

4 unique locations (10 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility (3)

Storage Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED New Build Generating CMU South Redhouse South Redhouse +1 more KY1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)

1hr Duration battery storage project. (2)

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU SRHA05 KY1
Active • 2027-28 (T-4), 2026-27 (T-4)
2.27 MW
Heatherywood Road, Kirkcaldy KY1 3NW (2 components)

1hr duration battery storage project. (2)

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU South Redhouse KY1
Active • 2025-26 (T-4), 2022-23 (T-1)
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU BRLR Redhouse KY1
Active • 2028-29 (T-4)
1.05 MW
Loading map...
Showing 4 locations