Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

6 unique locations (22 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated land within a compound at Wood Farm
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich A Norwich B +1 more Not Prequalified NR14
Active β€’ 2027-28 (T-4), 2025-26 (T-4)
10.77 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Atherton
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
β€’ New Build 2 hour battery storage system.
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
22.29 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (6 components)
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active β€’ 2029-30 (T-4), 2027-28 (T-4) ...
18.41 MW
Land at former East Midlands Electricity Depot, Hawkins Lane, Burton upon Trent, DE14 1DB (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 25MW for a 1 hour duration installed on designated land within a compound at Burton upon trent

Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Burton Not Prequalified DE14
Active β€’ 2025-26 (T-4)
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
β€’ 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Reciprocating engines Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Belvedere A Belvedere B Not Prequalified MK17
Active β€’ 2025-26 (T-4)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
β€’ New Build 2 Hour Battery Storage Plant.
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
30.65 MW
Loading map...
Showing 6 locations