Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

15 unique locations (152 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (11 components)
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Unproven DSR CMU Hulley Road SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Potash Farm, Nash Road, Beachampton, MK19 6EA (6 components)

49.900MW one-hour duration battery energy storage facility.

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Stony A Stony A +4 more MK19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.92 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (8 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS2 AGABS3 +2 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (12 components)
• 20.000 MW of battery storage located at Lascar Works
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ADSLS2 ADSLS2 +4 more BL9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components)
• 19.500 MW of battery storage located at Hereford.
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGLAR2 AGLAR2 +1 more HR1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.94 MW
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.46 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• 5.4 MW of battery storage units across different sites
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS2 AGABS3 +3 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (10 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Heywood Grange,Dilhorne,Staffordshire,ST10 2PL
• 1.000MW of battery storage located at Staffordshire.
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS1 AGABS4 +2 more ST10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility.

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Ferrymuir Ferrymuir +1 more KY15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.94 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (20 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD Separate connection
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD Separate connection
DSR Battery Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS1 ABS2 +4 more PR2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Drayton Manor Farm, Alcester Road, Stratford-upon-Avon, CV37 9RG (10 components)
• 0.400MW of battery storage located at Stratford-Upon-Avon.
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• 1 x 1MW / 1.2 MWh BYD Lithium Ion Battery: at Drayton Manor Farm,Alcester Road,Stratford-upon-Avon,CV37 9RG
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Carlton,Stockton-On-Tees,TS21 1EA (10 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA
• 1.200MW of battery storage located at Stockton-on-Tees.
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
DSR Storage (Duration 1h) LIMEJUMP LTD New Build Generating CMU Rejected TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (10 components)
• 0.800MW of battery storage located at Wiltshire.
• 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
• 1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT
DSR Storage (Duration 1h) LIMEJUMP LTD Unproven DSR CMU ABS1 BA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• 5.2MW of batteries across several sites
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS1 AGABS3 +3 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Loading map...
Showing 15 locations