Storage (Duration 1h)

1 unique locations (2 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components) Geocoding Needed

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Storage (Duration 1h) LIGHTSOURCE SPV 115 LIMITED New Build Generating CMU Burwell Storage Facility CB25
Active β€’ 2025-26 (T-4), 2022-23 (T-1)
1.15 MW