Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

12 unique locations (141 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGHUL2 AGHUL2 +2 more SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (11 components)
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Unproven DSR CMU Hulley Road SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Mill Farm, Caythorpe, Heath Ln, Grantham, NG32 3ER (13 components)
• Battery Storage located at Grantham. (2)
• 7 MW of Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Storage Storage (Duration 1h) Limejump Virtual 1 Limited Existing Generating CMU Mill Farm MillFarm1 +2 more NG32
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2.21 MW
Land North of Clayhill Farm Westoning, MK45 5JD (18 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD (2)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.31 MW
Land North of Clayhill Farm Westoning MK45 5JD (18 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• 6 MW Battery Storage facility located at Westoning.
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU Banana Clayhill MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.31 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS2 AGABS3 +3 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Hungerford Farm, Winchfield, Hook RG27 8SW (10 components)
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• 5.4 MW of battery storage units across different sites
DSR Storage (Duration 1h) GSES 1 LIMITED Unproven DSR CMU Anesco DSRA02 Rejected RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• 5.2MW of batteries across several sites
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS1 AGABS3 +3 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• 5.2MW of batteries across several sites
DSR Storage (Duration 1h) GSES 1 LIMITED Unproven DSR CMU Anesco DSR01 Rejected TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Loading map...
Showing 12 locations